The value of maintenance delay flexibility for improved spare parts inventory management

被引:16
|
作者
Basten, Rob J., I [1 ]
Ryan, Jennifer K. [2 ]
机构
[1] Eindhoven Univ Technol, POB 513, NL-5600 MB Eindhoven, Netherlands
[2] Univ Nebraska, 1400 R St, Lincoln, NE 68588 USA
基金
美国国家科学基金会;
关键词
Inventory; Spare parts; Maintenance flexibility; POLICIES; SYSTEMS; MODEL; OPTIMIZATION; INFORMATION; ALLOCATION;
D O I
10.1016/j.ejor.2019.04.023
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Capital assets are typically maintained by replacing components with spare parts. Often, there is flexibility to delay planned, preventive maintenance when spare parts are required to perform more urgent unplanned, corrective maintenance. In this case, keeping a single stock of inventory to satisfy both types of demand can be beneficial. Therefore, we study a periodic review inventory system with a single stocking point and a zero replenishment lead time, used to meet lower-priority demands that are planned, as well as stochastic, high-priority demands. We study the impact of flexibility in performing planned maintenance on the optimal inventory policy. When planned maintenance may be delayed at most once, i.e., for one period, a myopic policy is optimal. When it may be delayed to the next period for an unlimited number of times, we characterize the structure of the optimal policy. We further propose two extensions, one in which delayed planned maintenance may become unplanned and one in which the total maintenance delay costs are increasing and convex in the number of delayed maintenance actions. Numerically, we find that allowing a single delay provides a system performance very close to that when unlimited delays are allowed. This result becomes even stronger in the context of the two model extensions. These results are important for practice, since maintenance managers are unlikely to accept the unlimited delay policy, while the one delay policy is likely to be more acceptable. Finally, we develop myopic heuristic policies and demonstrate that they perform quite close to optimal. (C) 2019 Elsevier B.V. All rights reserved.
引用
收藏
页码:646 / 657
页数:12
相关论文
共 50 条
  • [1] Critical project planning and spare parts inventory management in shutdown maintenance
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 219
  • [2] Critical project planning and spare parts inventory management in shutdown maintenance
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    [J]. Reliability Engineering and System Safety, 2022, 219
  • [3] Spare parts inventory control based on maintenance planning
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 193
  • [4] Spare parts inventory control for the maintenance of productive plants
    Bevilacqua, M.
    Clarapica, F. E.
    Giacchetta, G.
    [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1380 - 1384
  • [5] NUMBERING SYSTEM SIMPLIFIES MAINTENANCE SPARE PARTS INVENTORY
    LONG, G
    [J]. PLANT ENGINEERING, 1979, 33 (06) : 137 - 140
  • [6] Inventory management of spare parts in an energy company
    Guajardo, Mario
    Ronnqvist, Mikael
    Halvorsen, Ann Mari
    Kallevik, Svein Inge
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2015, 66 (02) : 331 - 341
  • [7] SELECTED ASPECTS OF SPARE PARTS INVENTORY MANAGEMENT
    Jurczyk, Krzysztof
    Karkula, Marek
    [J]. CLC 2013: CARPATHIAN LOGISTICS CONGRESS - CONGRESS PROCEEDINGS, 2014, : 318 - 323
  • [8] Service differentiation in spare parts inventory management
    Kranenburg, A. A.
    van Houtum, G. J.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2008, 59 (07) : 946 - 955
  • [9] Spare Parts Inventory Management: A Literature Review
    Zhang, Shuai
    Huang, Kai
    Yuan, Yufei
    [J]. SUSTAINABILITY, 2021, 13 (05) : 1 - 23
  • [10] Simulations on the Spare Parts Inventory Management of Equipment Maintenance in manufacturing enterprise based on Flexsim
    Sun, Xue
    [J]. ADVANCES IN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-4, 2013, 712-715 : 3181 - 3186