共 50 条
- [42] A hybrid model of fuzzy goal programming and grey numbers in continuous project time, cost, and quality tradeoff INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 71 (1-4): : 117 - 126
- [44] A hybrid model of fuzzy goal programming and grey numbers in continuous project time, cost, and quality tradeoff The International Journal of Advanced Manufacturing Technology, 2014, 71 : 117 - 126
- [47] Revising One Time Lag Of Water Level Forecasting With Neural Fuzzy System FIFTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 3, PROCEEDINGS, 2008, : 617 - +
- [48] Base management heritage system: Methods of structural qualification and maintenance costs estimated over time STRUCTURAL ANALYSIS OF HISTORICAL CONSTRUCTIONS: ANAMNESIS, DIAGNOSIS, THERAPY, CONTROLS, 2016, : 193 - 200
- [49] The application of evaluation model using fuzzy grey decision system for the safety of hillside residence area in Taiwan WSEAS Transactions on Information Science and Applications, 2007, 4 (05): : 916 - 923
- [50] Application of Multi-level Evaluation Model of Grey System for the Undergraduate Comprehensive Quality Evaluation COMPREHENSIVE EVALUATION OF ECONOMY AND SOCIETY WITH STATISTICAL SCIENCE, 2009, : 1051 - 1055