共 50 条
- [41] Materials management at the gotthard base tunnel - Experience from 15 years of construction Geomechanik und Tunnelbau, 2009, 2 (05): : 619 - 626
- [42] Extensive concrete and shotcrete systems for the world's longest tunnel (Gotthard base tunnel-56km) NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 62 - 68
- [43] The tunnel-air equipment of Tauern-railway. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1915, 59 : 321 - 324
- [44] Research on detection equipment for the state of railway tunnel lining EQUIPMENT MANUFACTURING TECHNOLOGY AND AUTOMATION, PTS 1-3, 2011, 317-319 : 2421 - +
- [46] Railways Technology - the key lessons learnt from the Gotthard Base Tunnel project in Switzerland UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1691 - 1697
- [47] The Gotthard Base Tunnel: the challenges of implementing the hoisting machinery in the Sedrun shafts - the owners view UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1698 - 1705
- [48] Brittle tectonics in metamorphic rocks: Implications for the excavation of the Bodio Section of the Gotthard Base Tunnel ROCK MECHANICS: MEETING SOCIETY'S CHALLENGES AND DEMANDS, VOLS 1 AND 2: VOL: FUNDAMENTALS, NEW TECHNOLOGIES & NEW IDEAS; VOL 2: CASE HISTORIES, 2007, : 1141 - 1147
- [49] High-pH waters from the new Gotthard rail base tunnel, Switzerland WATER-ROCK INTERACTION, VOLS 1 AND 2, PROCEEDINGS, 2007, : 251 - 254
- [50] Design of inner lining at the Gotthard Base Tunnel, approach for the evaluation of loads, the different types of lining UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1439 - 1443