共 50 条
- [21] ETCS standard cab signaling system for the Gotthard base tunnel Eisenbahningenieur, 2000, 51 (11): : 63 - 66
- [22] Gotthard base tunnel. Concentrated technical system installation 2000, Tetzlaff Verlag GmbH and Co. KG (51):
- [26] Gotthard base tunnel - simultaneous execution of civil works construction and installation of electromechanical equipment in the Sedrun section - implementation and conclusions UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1683 - 1690
- [27] Gotthard Base Tunnel - Choice of the tunnel system from today's point of view Geomechanik und Tunnelbau, 2016, 9 (02): : 79 - 93
- [30] Gotthard Base Tunnel in Sedrun - Experience with the construction and operation of two shafts Höfle, H. (hartmuth.hoefle@alptransit.ch), 1600, Ernst und Sohn (06):