Efficiency test research on 1# unit of Xiaolangdi hydropower station

被引:0
|
作者
State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing 100084, China [1 ]
不详 [2 ]
不详 [3 ]
不详 [4 ]
机构
来源
Shuili Fadian Xuebao | 2007年 / 2卷 / 124-128期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Research on efficiency test of a turbine in Khan Khwar hydropower station
    Zhang, H. K.
    Liang, Z.
    Liu, X. B.
    Liu, D. M.
    Deng, M. G.
    Wang, H. Y.
    26TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, PTS 1-7, 2013, 15
  • [2] Design characteristics of hydrogenerator for Xiaolangdi hydropower station
    Peng, Xiaohua
    Shuili Fadian/Water Power, (06): : 42 - 45
  • [3] The research of Unit Daily Load Process Model of hydropower station
    Gou, L.
    Chen, S. L.
    ADVANCED ENGINEERING AND TECHNOLOGY III, 2017, : 123 - 128
  • [4] Pressure observation for the 1# Orifice Tunnel in Xiaolangdi Project
    Guo, J
    Liu, JG
    Zhang, D
    Liu, ZP
    HYDRAULICS OF RIVERS, WATER WORKS AND MACHINERY, VOL 1, THEME D, PROCEEDINGS: 21ST CENTURY: THE NEW ERA FOR HYDRAULIC RESEARCH AND ITS APPLICATIONS, 2001, : 663 - 668
  • [5] Studying leakage from left abutment of Xiaolangdi hydropower station using tracing method
    Fan, Zhechao, 1600, Journal of Chemical and Pharmaceutical Research, 3/668 Malviya Nagar, Jaipur, Rajasthan, India (06):
  • [6] Construction Research on The Green Hydropower of Houziyan Hydropower Station
    Wu, Shengguang
    Zhou, Mingtao
    Chen, Feng
    Hu, Huan
    ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY III, PTS 1-4, 2013, 397-400 : 717 - 721
  • [7] Research of CCS Hydropower Station Bieri sand-flushing facility test
    Chen Junjie
    Ren Yanfen
    Li Yuanfa
    Wu Guoying
    HYDRAULIC ENGINEERING, 2012 SREE CONFERENCE, 2013, : 117 - 120
  • [8] Research on Power Benefits Assessment of SiPing Hydropower Station under the Operation of Sanliping Hydropower Station
    Tian Yu
    Lei Xiaohui
    Yu Qian
    Sun Jialan
    2010 INTERNATIONAL CONFERENCE ON COMMUNICATION AND VEHICULAR TECHNOLOGY (ICCVT 2010), VOL II, 2010, : 10 - 13
  • [10] Unit Commissioning in Shisanling Pumped Storage Hydropower Station
    Meng Liping North China Power Group
    Electricity, 1996, (04) : 30 - 33