Research on efficiency test of a turbine in Khan Khwar hydropower station

被引:0
|
作者
Zhang, H. K. [1 ]
Liang, Z. [1 ]
Liu, X. B.
Liu, D. M.
Deng, M. G. [1 ]
Wang, H. Y.
机构
[1] Commissioning & Test Inst Sichuan Elect Power Ind, Chengdu 610072, Peoples R China
来源
26TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, PTS 1-7 | 2013年 / 15卷
关键词
D O I
10.1088/1755-1315/15/6/062062
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The efficiency test is an important indicator to evaluate the energy conversion performance of a hydraulic turbine. For hydropower stations which do not have the direct flow measurement conditions, whether the characteristic curve of a turbine obtained through similarity theory conversion by using the comprehensive characteristic curve of the turbine can correctly reflect the operating performance of the prototype unit is a key issue in this industry. By taking the No. 1 unit of Khan Khwar hydropower station as the example, the efficiency test of this turbine was studied on the site, including the measurement method of test parameters, the configuration of the computer test system, as well as the processing and analysis of test data.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Efficiency test research on 1# unit of Xiaolangdi hydropower station
    State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing 100084, China
    不详
    不详
    不详
    Shuili Fadian Xuebao, 2007, 2 (124-128):
  • [2] A runner modernization in a Deriaz turbine hydropower station
    Kikuta, H.
    Suzuki, R.
    Nakamura, S.
    Anciger, D.
    29TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, 2019, 240
  • [3] Research on Francis Turbine Modeling for Large Disturbance Hydropower Station Transient Process Simulation
    Zhang, Guangtao
    Cheng, Yuanchu
    Lu, Na
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [4] Construction Research on The Green Hydropower of Houziyan Hydropower Station
    Wu, Shengguang
    Zhou, Mingtao
    Chen, Feng
    Hu, Huan
    ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY III, PTS 1-4, 2013, 397-400 : 717 - 721
  • [5] Research of CCS Hydropower Station Bieri sand-flushing facility test
    Chen Junjie
    Ren Yanfen
    Li Yuanfa
    Wu Guoying
    HYDRAULIC ENGINEERING, 2012 SREE CONFERENCE, 2013, : 117 - 120
  • [6] Dan jiang kou hydropower station turbine refurbishment
    Zhang, R. Y.
    Nie, S. Q.
    Bazin, D.
    Cheng, J. H.
    26TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, PTS 1-7, 2013, 15
  • [7] Research on the mechanism of sediment erosion in the bucket of a large-scale Pelton turbine at a hydropower station
    Liu, Jitao
    Liu, Xiaobing
    Chang, Xiao
    Qin, Bei
    Pang, Jiayang
    Lai, Zhenming
    Jiang, Dengyun
    Qin, Mengjun
    Yao, Bing
    Zeng, Yongzhong
    POWDER TECHNOLOGY, 2025, 455
  • [8] Research on Power Benefits Assessment of SiPing Hydropower Station under the Operation of Sanliping Hydropower Station
    Tian Yu
    Lei Xiaohui
    Yu Qian
    Sun Jialan
    2010 INTERNATIONAL CONFERENCE ON COMMUNICATION AND VEHICULAR TECHNOLOGY (ICCVT 2010), VOL II, 2010, : 10 - 13
  • [9] Research on Power Benefits Assessment of SiPing Hydropower Station under the Operation of Sanliping Hydropower Station
    Tian Yu
    Lei Xiaohui
    Yu Qian
    Sun Jialan
    INTERNATIONAL CONFERENCE ON APPLIED PHYSICS AND INDUSTRIAL ENGINEERING 2012, PT A, 2012, 24 : 512 - 517
  • [10] A hydropower station energy dissipation shape optimization test
    Chen Yang
    Jiang Bole
    Chen Hui
    APPLIED MECHANICS AND MATERIALS II, PTS 1 AND 2, 2014, 477-478 : 825 - 828