共 50 条
- [2] Cascaded Hydropower Station Daily Load Dispatch with Time-Shared Price PROCEEDINGS OF THE 5TH INTERNATIONAL YELLOW RIVER FORUM ON ENSURING WATER RIGHT OF THE RIVER'S DEMAND AND HEALTHY RIVER BASIN MAINTENANCE, VOL V, 2015, : 83 - 89
- [3] Vibration characteristics of the unit-plant structure of a hydropower station under transient load-up process Zhendong yu Chongji/Journal of Vibration and Shock, 2019, 38 (18): : 53 - 61
- [4] Research on optimal load allocation in hydropower Station based on DQN algorithm Shuili Xuebao/Journal of Hydraulic Engineering, 2024, 55 (11): : 1345 - 1355
- [5] Hydraulic Model Experimental Research of SUE Hydropower Station ADVANCES IN ENVIRONMENTAL TECHNOLOGIES, PTS 1-6, 2013, 726-731 : 3554 - 3558
- [6] Efficiency test research on 1# unit of Xiaolangdi hydropower station Shuili Fadian Xuebao, 2007, 2 (124-128):
- [7] MOC-CFD coupled model of load rejection in hydropower station 30TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS (IAHR 2020), 2021, 774
- [8] Time Scale Effect of Unit Load Allocation of Hydropower Station With Dimension Reduction Strategy Dianwang Jishu/Power System Technology, 2024, 48 (11): : 4456 - 4463
- [9] Construction Research on The Green Hydropower of Houziyan Hydropower Station ADVANCED DESIGN AND MANUFACTURING TECHNOLOGY III, PTS 1-4, 2013, 397-400 : 717 - 721
- [10] Research and development of visual numerical simulation software for transient process of hydropower station 30TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS (IAHR 2020), 2021, 774