Train rescheduling and platforming in large high-speed railway stations

被引:0
|
作者
Teng J. [1 ,2 ,3 ]
Gao J. [1 ,2 ,3 ]
Wang P. [1 ,2 ,3 ]
Qu S. [4 ]
机构
[1] College of Transportation Engineering, Tongji University, 4800 Cao'an Road, Shanghai
[2] Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Tongji University, 4800 Cao'an Road, Shanghai
[3] Shanghai Collaborative Innovation Research Center for Multi-Network & Multi-Modal Rail Transit, Tongji University, 4800 Cao'an Road, Shanghai
[4] Transport Department, China Railway Shanghai Group Co. Ltd, 80 East Tianmu Road, Shanghai
基金
中国国家自然科学基金; 上海市自然科学基金;
关键词
Large high-speed railway station; Multiple objective mixed-integer nonlinear programming; Rescheduling and platforming; Rolling horizon;
D O I
10.1016/j.ijtst.2023.11.001
中图分类号
学科分类号
摘要
To deal with train delays in large high-speed railway stations, a multi-objective mixed-integer nonlinear programming (MO-MINLP) optimization model was proposed. The model used the arrival time, departure time, track occupation, and route selection as the decision variables and fully considered the station infrastructure layout, train operational requirements, and time standards as limiting factors. The optimization objective was to minimize train delays and reduce track and route adjustments. To realize the large-scale and rapid solution of the MO-MINLP model, this study proposed a rolling horizon optimization algorithm that used “half an hour” as a time interval and solved the rescheduling and platforming problem of each time interval step-by-step. In numerical experiments, 227 train movements under delay circumstances in Hangzhoudong station were optimized by using the proposed model and solution algorithm. The results show that the proposed MO-MINLP model could resolve route conflicts, compress unnecessary dwell times, and reduce train delays; the solution algorithm could efficiently increase the computational speed. The maximum solution time for optimizing the 227 train movements is 15 min 24 s. © 2023 Tongji University and Tongji University Press
引用
收藏
页码:100 / 118
相关论文
共 50 条
  • [41] Speed Segmentation Method of Train Braking Curve for High-Speed Railway
    Zhang Y.
    Chen Z.
    Wang J.
    Zhang G.
    Zhongguo Tiedao Kexue/China Railway Science, 2021, 42 (05): : 155 - 161
  • [42] Min-Max Approach for High-Speed Train Scheduling and Rescheduling Models
    Bersani, Chiara
    Estil-Les, Maria A. Del Cacho
    Sacile, Roberto
    IEEE ACCESS, 2021, 9 : 41042 - 41051
  • [43] High-speed Train Rescheduling Based on a New Kind of Particle Optimization Algorithm
    Qin, Ning
    Meng, Xuelei
    ENGINEERING LETTERS, 2023, 31 (02) : 640 - 647
  • [44] GRAPHIC STANDARDS FOR THE DESIGN OF SPACES IN HIGH-SPEED RAILWAY STATIONS
    Torres, Juan Bautista Font
    Valldecabres, Jorge Luis Garcia
    Meseguer, Luis Cortes
    EGE-REVISTA DE EXPRESION GRAFICA EN LA EDIFICACION, 2024, (21): : 133 - 142
  • [45] Real-time high-speed train rescheduling in case of a complete blockage
    Zhan, Shuguang
    Kroon, Leo G.
    Veelenturf, Lucas P.
    Wagenaar, Joris C.
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2015, 78 : 182 - 201
  • [46] Optimization of High-Speed Railway Network Based on Accessibility of Stations
    Chen, Jinqu
    Liu, Jie
    Zhang, Wenli
    Yin, Yong
    Liu, Yuhong
    PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 589 - 598
  • [47] Energy-efficient high-speed train rescheduling during a major disruption
    Zhan, Shuguang
    Wang, Pengling
    Wong, S. C.
    Lo, S. M.
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2022, 157
  • [48] Integration of Train Control and Online Rescheduling for High-Speed Railways in Case of Emergencies
    Dong, Hairong
    Liu, Xuan
    Zhou, Min
    Zheng, Wei
    Xun, Jing
    Gao, Shigen
    Song, Haifeng
    Li, Yidong
    Wang, Fei-Yue
    IEEE TRANSACTIONS ON COMPUTATIONAL SOCIAL SYSTEMS, 2022, 9 (05): : 1574 - 1582
  • [49] Integration of Train Control and Online Rescheduling for High-speed Railways: Challenges and Future
    Ning B.
    Dong H.-R.
    Zheng W.
    Xun J.
    Gao S.-G.
    Wang H.-W.
    Meng L.-Y.
    Li Y.-D.
    Zidonghua Xuebao/Acta Automatica Sinica, 2019, 45 (12): : 2208 - 2217
  • [50] Timetable Rescheduling Model for High-speed Railway Based on Constraint Programming Method
    Zeng Y.
    Zhang Q.
    Chen F.
    Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (04): : 1 - 9