Train rescheduling and platforming in large high-speed railway stations

被引:0
|
作者
Teng J. [1 ,2 ,3 ]
Gao J. [1 ,2 ,3 ]
Wang P. [1 ,2 ,3 ]
Qu S. [4 ]
机构
[1] College of Transportation Engineering, Tongji University, 4800 Cao'an Road, Shanghai
[2] Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Tongji University, 4800 Cao'an Road, Shanghai
[3] Shanghai Collaborative Innovation Research Center for Multi-Network & Multi-Modal Rail Transit, Tongji University, 4800 Cao'an Road, Shanghai
[4] Transport Department, China Railway Shanghai Group Co. Ltd, 80 East Tianmu Road, Shanghai
基金
中国国家自然科学基金; 上海市自然科学基金;
关键词
Large high-speed railway station; Multiple objective mixed-integer nonlinear programming; Rescheduling and platforming; Rolling horizon;
D O I
10.1016/j.ijtst.2023.11.001
中图分类号
学科分类号
摘要
To deal with train delays in large high-speed railway stations, a multi-objective mixed-integer nonlinear programming (MO-MINLP) optimization model was proposed. The model used the arrival time, departure time, track occupation, and route selection as the decision variables and fully considered the station infrastructure layout, train operational requirements, and time standards as limiting factors. The optimization objective was to minimize train delays and reduce track and route adjustments. To realize the large-scale and rapid solution of the MO-MINLP model, this study proposed a rolling horizon optimization algorithm that used “half an hour” as a time interval and solved the rescheduling and platforming problem of each time interval step-by-step. In numerical experiments, 227 train movements under delay circumstances in Hangzhoudong station were optimized by using the proposed model and solution algorithm. The results show that the proposed MO-MINLP model could resolve route conflicts, compress unnecessary dwell times, and reduce train delays; the solution algorithm could efficiently increase the computational speed. The maximum solution time for optimizing the 227 train movements is 15 min 24 s. © 2023 Tongji University and Tongji University Press
引用
收藏
页码:100 / 118
相关论文
共 50 条
  • [21] An Optimization Method of High-Speed Railway Rescheduling to Meet Unexpected Large Passenger Flow
    Zhao, Junduo
    Li, Haiying
    Meng, Lingyun
    Miao, Jianrui
    JOURNAL OF ADVANCED TRANSPORTATION, 2022, 2022
  • [22] An Optimization Method of High-Speed Railway Rescheduling to Meet Unexpected Large Passenger Flow
    Zhao, Junduo
    Li, Haiying
    Meng, Lingyun
    Miao, Jianrui
    Journal of Advanced Transportation, 2022, 2022
  • [23] Analysis on impact of redundant time on train rescheduling in high speed railway
    He Z.
    He, Zhenhuan (zhhe@bjtu.edu.cn), 1600, Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (09): : 78 - 87
  • [24] Optimal train rescheduling and local rerouting in a hub high-speed railway station considering logical resource
    Hao, Weining
    Li, Haiying
    Meng, Lingyun
    Liao, Zhengwen
    Journal of Railway Science and Engineering, 2024, 21 (11) : 4405 - 4416
  • [25] A High-speed Train Timetable Rescheduling Approach in case of Disturbances
    Gao, Xinyu
    2019 8TH INTERNATIONAL CONFERENCE ON TRANSPORTATION AND TRAFFIC ENGINEERING (ICTTE 2019), 2020, 308
  • [26] A multi-agent simulation based train platforming research for facilitating passenger transfer in a high-speed railway station
    Zhang, Hongxiang
    Guo, Miao
    Hu, Liuyang
    Lu, Gongyuan
    SIMULATION MODELLING PRACTICE AND THEORY, 2024, 130
  • [27] A Fuzzy Optimization Model for High-Speed Railway Timetable Rescheduling
    Wang, Li
    Qin, Yong
    Xu, Jie
    Jia, Limin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2012, 2012
  • [28] A real-time train routing and platforming problem in complex railway stations
    Bai, Lijie
    Yuan, Zhiming
    Zhao, Hongtao
    Zhang, Tao
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2021, 41 (04) : 5129 - 5137
  • [29] A Multistage Decision Optimization Approach for Train Timetable Rescheduling Under Uncertain Disruptions in a High-Speed Railway Network
    Zhang, Pu
    Zhao, Peng
    Qiao, Ke
    Wen, Pengcheng
    Li, Peng
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2023, 24 (06) : 6307 - 6321
  • [30] Improving Synchronization in High-Speed Railway and Air Intermodality: Integrated Train Timetable Rescheduling and Passenger Flow Forecasting
    Tan, Yuyan
    Li, Yibo
    Wang, Ruxin
    Mi, Xiwei
    Li, Yaxuan
    Zheng, Hao
    Ke, Yu
    Wang, Yan
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2022, 23 (03) : 2651 - 2667