Train rescheduling and platforming in large high-speed railway stations

被引:0
|
作者
Teng J. [1 ,2 ,3 ]
Gao J. [1 ,2 ,3 ]
Wang P. [1 ,2 ,3 ]
Qu S. [4 ]
机构
[1] College of Transportation Engineering, Tongji University, 4800 Cao'an Road, Shanghai
[2] Shanghai Key Laboratory of Rail Infrastructure Durability and System Safety, Tongji University, 4800 Cao'an Road, Shanghai
[3] Shanghai Collaborative Innovation Research Center for Multi-Network & Multi-Modal Rail Transit, Tongji University, 4800 Cao'an Road, Shanghai
[4] Transport Department, China Railway Shanghai Group Co. Ltd, 80 East Tianmu Road, Shanghai
基金
中国国家自然科学基金; 上海市自然科学基金;
关键词
Large high-speed railway station; Multiple objective mixed-integer nonlinear programming; Rescheduling and platforming; Rolling horizon;
D O I
10.1016/j.ijtst.2023.11.001
中图分类号
学科分类号
摘要
To deal with train delays in large high-speed railway stations, a multi-objective mixed-integer nonlinear programming (MO-MINLP) optimization model was proposed. The model used the arrival time, departure time, track occupation, and route selection as the decision variables and fully considered the station infrastructure layout, train operational requirements, and time standards as limiting factors. The optimization objective was to minimize train delays and reduce track and route adjustments. To realize the large-scale and rapid solution of the MO-MINLP model, this study proposed a rolling horizon optimization algorithm that used “half an hour” as a time interval and solved the rescheduling and platforming problem of each time interval step-by-step. In numerical experiments, 227 train movements under delay circumstances in Hangzhoudong station were optimized by using the proposed model and solution algorithm. The results show that the proposed MO-MINLP model could resolve route conflicts, compress unnecessary dwell times, and reduce train delays; the solution algorithm could efficiently increase the computational speed. The maximum solution time for optimizing the 227 train movements is 15 min 24 s. © 2023 Tongji University and Tongji University Press
引用
收藏
页码:100 / 118
相关论文
共 50 条
  • [1] Optimizing Train-Platforming Plans at Arrival-Departure Tracks of High-speed Railway Stations
    Wang, Hanxiao
    Yue, Yixiang
    2020 IEEE 5TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION ENGINEERING (IEEE ICITE 2020), 2020, : 461 - 466
  • [2] Optimization Based High-Speed Railway Train Rescheduling with Speed Restriction
    Wang, Li
    Mo, Wenting
    Qin, Yong
    Dou, Fei
    Jia, Limin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2014, 2014
  • [3] A Memetic Algorithm for High-Speed Railway Train Timetable Rescheduling
    Ding, Shuxin
    Zhang, Tao
    Liu, Ziyuan
    Wang, Rongsheng
    Lu, Sai
    Xin, Bin
    Yuan, Zhiming
    JOURNAL OF ADVANCED COMPUTATIONAL INTELLIGENCE AND INTELLIGENT INFORMATICS, 2022, 26 (03) : 407 - 417
  • [4] Model and Algorithm for Train Platform Scheme Rescheduling at Large High-speed Railway Station
    Peng Q.
    Ning J.
    Lu G.
    Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (01): : 10 - 19
  • [5] Simultaneous Optimization of Train Timetabling and Platforming Problems for High-Speed Multiline Railway Network
    Zhang, Qin
    Zhu, Xiaoning
    Wang, Li
    Wang, Shuai
    JOURNAL OF ADVANCED TRANSPORTATION, 2021, 2021
  • [6] Train rescheduling in a major disruption on a high-speed railway network with seat reservation
    Zhan, Shuguang
    Wong, S. C.
    Shang, Pan
    Lo, S. M.
    TRANSPORTMETRICA A-TRANSPORT SCIENCE, 2022, 18 (03) : 532 - 567
  • [7] A Real-time Train Timetable Rescheduling Approach to High-speed Railway
    Gao, Xinyu
    2019 CHINESE AUTOMATION CONGRESS (CAC2019), 2019, : 2024 - 2029
  • [8] ADMM-based joint rescheduling method for high-speed railway timetabling and platforming in case of uncertain perturbation✩
    Liu, Xuan
    Zhou, Min
    Dong, Hairong
    Wu, Xingtang
    Li, Yidong
    Wang, Fei-Yue
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2023, 152
  • [9] High-speed train scheduling and rescheduling models
    Estil-les, Maria del Cacho
    Bersani, Chiara
    Sacile, Roberto
    2020 IEEE 15TH INTERNATIONAL CONFERENCE OF SYSTEM OF SYSTEMS ENGINEERING (SOSE 2020), 2020, : 331 - 336
  • [10] Integrated optimization of train rescheduling decisions and train speeds based on satisfactory optimization for high-speed railway
    Long, Sihui
    Meng, Lingyun
    Wang, Yihui
    Miao, Jianrui
    Luan, Xiaojie
    2022 IEEE 25TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2022, : 4117 - 4123