Using a systematic organization change approach to improve productivity and application with a case study on semiconductor manufacturing company

被引:0
|
作者
机构
[1] Yang, Tsung-Ming
[2] Su, Chao-Ton
来源
Su, C.-T. (ctsu@mx.nthu.edu.tw) | 1600年 / Chinese Society for Quality卷 / 19期
关键词
Productivity;
D O I
10.6220/joq.2012.19(1).03
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] A Case Study in the Application of the Systematic Approach to Training in the Logging Industry
    Lagerstrom, Elise
    Magzamen, Sheryl
    Brazile, William
    Stallones, Lorann
    Ayers, Paul
    Rosecrance, John
    SAFETY, 2019, 5 (03)
  • [42] MANAGING COMPLEXITY IN MANUFACTURING CHANGEOVERS: A SUSTAINABLE MANUFACTURING-ORIENTED APPROACH AND THE APPLICATION CASE STUDY
    Mustafa, Khalid
    Cheng, Kai
    PROCEEDINGS OF THE ASME 11TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2016, VOL 2, 2016,
  • [43] BUSINESS PROCESS CHANGE USING ARIS: THE CASE STUDY OF A CROATIAN INSURANCE COMPANY
    Bosilj-Vuksic, Vesna
    Ivandic-Vidovic, Darija
    MANAGEMENT-JOURNAL OF CONTEMPORARY MANAGEMENT ISSUES, 2005, 10 (01) : 77 - 91
  • [44] The identification of HSE processes and their interaction with the organization processes in order to provide solutions to improve: case study in a construction company
    Alibabaei, Ahmad
    Matin, Amirhossein
    Khanijazani, Reza
    Teimori-Boghsani, Gholamheidar
    Nourian, Rouhollah
    Bastani, Hamid
    Mohebi, Afshin
    POLICY AND PRACTICE IN HEALTH AND SAFETY, 2020, 18 (02) : 122 - 139
  • [45] Analysis of Factors Influencing Productivity Using Craftsmen Questionnaires: Case Study in a Chilean Construction Company
    Rivas, Rodrigo A.
    Borcherding, John D.
    Gonzalez, Vicente
    Alarcon, Luis F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (04): : 312 - 320
  • [46] Curriculum development for semiconductor industry in Malaysia: A case study of technical development programs for technicians and engineers in wafer manufacturing company
    bin Lin, Abdullah
    2006 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop, 2006, : 170 - 173
  • [47] Using a risk-based approach to project scheduling: A case illustration from semiconductor manufacturing
    Zafra-Cabeza, Ascension
    Ridao, Miguel A.
    Camacho, Eduardo F.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 190 (03) : 708 - 723
  • [48] APPLICATION OF VALUE STREAM MAPPING IN ORDER TO RECOGNIZE OPPORTUNITIES TO IMPROVE PROCESSES AND INCREASE BUSINESS PROCESS PERFORMANCE: A CASE STUDY FROM MANUFACTURING COMPANY IN THE CZECH REPUBLIC
    Ondra, Pavel
    14TH ANNUAL INTERNATIONAL BATA CONFERENCE FOR PH.D. STUDENTS AND YOUNG RESEARCHERS (DOKBAT), 2018, : 199 - 210
  • [49] MEASURING THE LEANNESS OF MANUFACTURING SYSTEMS BY USING FUZZY TOPSIS: A CASE STUDY OF THE 'PARIZAN SANAT' COMPANY
    Alemi, M. A.
    Akram, R.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2013, 24 (03): : 166 - 174
  • [50] WORKER SCHEDULING OF BANBURY PROCESS USING GOAL PROGRAMMING: A TIRE MANUFACTURING COMPANY CASE STUDY
    Chaihanit, Chonnipa
    Butrat, Anan
    Supsomboon, Srisawat
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2024, 31 (02): : 258 - 277