WORKER SCHEDULING OF BANBURY PROCESS USING GOAL PROGRAMMING: A TIRE MANUFACTURING COMPANY CASE STUDY

被引:1
|
作者
Chaihanit, Chonnipa [1 ]
Butrat, Anan [1 ]
Supsomboon, Srisawat [1 ]
机构
[1] King Mongkuts Univ Technol North Bangkok KMUTNB, Sirindhorn Int Thai German Grad Sch Engn TGGS, Bangkok, Thailand
关键词
Worker Scheduling; Shift Scheduling; Goal Programming Method; Mathematical Model; Integer Linear Programming; INDUSTRY;
D O I
10.23055/ijietap.2024.31.2.9717
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In today's competitive business landscape, organizations must streamline their planning and management processes for efficiency and profitability. Effective resource management, especially in the case of human resources, is crucial. Scheduling challenges in human resource management become more complex when considering worker skills. Balancing fairness for workers and the company necessitates the inclusion of additional constraints and variables, making manual problem-solving more time-consuming and complex. This study proposes a Goal Programming Method, a mathematical model that addresses both primary and goal constraints, to optimize solutions and minimize deviation variables. The case study of a real manufacturer's Banbury process department with 51 workers, 24 tasks, and two shifts has been analyzed. The mathematical model is utilized to allocate tasks, optimize worker skill utilization, and identify positions to close when worker availability falls short.
引用
收藏
页码:258 / 277
页数:20
相关论文
共 50 条
  • [1] Modified Resource-Constrained Project Scheduling to Minimize Idle Time for Banbury Mixing Process: A Case Study in the Tire Manufacturing Industry
    Butrat, Anan
    Supsomboon, Srisawat
    MANAGEMENT SYSTEMS IN PRODUCTION ENGINEERING, 2023, 31 (03) : 263 - 270
  • [2] Surgical Operation Scheduling with Goal Programming and Constraint Programming: A Case Study
    Gur, Seyda
    Eren, Tamer
    Alakas, Haci Mehmet
    MATHEMATICS, 2019, 7 (03):
  • [3] Measurement of Manufacturing Effectiveness of a Company Using Analytical Hierarchical Process: A Case Study
    Lekurwale, R. R.
    Akarte, M. M.
    Raut, D. N.
    2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 1602 - 1606
  • [4] Shift Scheduling with the Goal Programming Method: A Case Study in the Glass Industry
    Kacmaz, Ozlem
    Alakas, Haci Mehmet
    Eren, Tamer
    MATHEMATICS, 2019, 7 (06)
  • [5] The supplier selection problem of a manufacturing company using the weighted multi-choice goal programming and MINMAX multi-choice goal programming
    Ho, Hui-Ping
    APPLIED MATHEMATICAL MODELLING, 2019, 75 : 819 - 836
  • [6] Scheduling Optimization Modelling: A Case Study of a Woven Label Manufacturing Company
    Wang, Chia-Nan
    Cheng, Zhao-Hong
    Phan, Nguyen Ky Phuc
    Nguyen, Van Thanh
    COMPUTER SYSTEMS SCIENCE AND ENGINEERING, 2021, 38 (02): : 239 - 249
  • [7] Improving a Manufacturing Process Using the 8Ds Method. A Case Study in a Manufacturing Company
    Realyvasquez-Vargas, Arturo
    Cecilia Arredondo-Soto, Karina
    Luis Garcia-Alcaraz, Jorge
    Jimenez Macias, Emilio
    APPLIED SCIENCES-BASEL, 2020, 10 (07):
  • [8] Police officer scheduling using goal programming
    Todovic, Dragana
    Makajic-Nikolic, Dragana
    Kostic-Stankovic, Milica
    Martic, Milan
    POLICING-AN INTERNATIONAL JOURNAL OF POLICE STRATEGIES & MANAGEMENT, 2015, 38 (02) : 295 - 313
  • [9] Resource allocation using goal programming - Case study
    Soni, B
    Bhatia, K
    SIXTH INTERNATIONAL CONFERENCE ON COMPUTERS IN AGRICULTURE, 1996, : 404 - 409
  • [10] Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming
    Moghaddam, Kamran S.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) : 704 - 716