共 50 条
- [31] Solving Cyclical Nurse Scheduling Problem Using Preemptive Goal Programming INTERNATIONAL SYMPOSIUM ON CURRENT PROGRESS IN MATHEMATICS AND SCIENCES 2016 (ISCPMS 2016), 2017, 1862
- [32] Nurse Scheduling with Shift Preferences in a Surgical Suite Using Goal Programming INDUSTRIAL ENGINEERING IN THE INDUSTRY 4.0 ERA, 2018, : 23 - 36
- [34] Process improvement through Six Sigma with Beta correction: a case study of manufacturing company INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 71 (1-4): : 717 - 730
- [35] The Application of a Business Process Modeling Architecture in the Supply Chain of a Manufacturing Company: A Case Study OPERATIONAL RESEARCH IN BUSINESS AND ECONOMICS, 2017, : 1 - 16
- [36] Process improvement through Six Sigma with Beta correction: a case study of manufacturing company The International Journal of Advanced Manufacturing Technology, 2014, 71 : 717 - 730
- [37] Improving Efficiency in a Manufacturing Company using the InMotion Process QUALITY-ACCESS TO SUCCESS, 2019, 20 (170): : 64 - 67
- [38] Maintenance and Availability Study of a Manufacturing Company: Case Study of a Flour Mill Company ADVANCES IN MATERIALS AND SYSTEMS TECHNOLOGIES IV, 2013, 824 : 584 - 594
- [39] Scheduling of part time personnel in a university library with analytic hierarchy process and goal programming PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2021, 27 (01): : 1 - 12