WORKER SCHEDULING OF BANBURY PROCESS USING GOAL PROGRAMMING: A TIRE MANUFACTURING COMPANY CASE STUDY

被引:1
|
作者
Chaihanit, Chonnipa [1 ]
Butrat, Anan [1 ]
Supsomboon, Srisawat [1 ]
机构
[1] King Mongkuts Univ Technol North Bangkok KMUTNB, Sirindhorn Int Thai German Grad Sch Engn TGGS, Bangkok, Thailand
关键词
Worker Scheduling; Shift Scheduling; Goal Programming Method; Mathematical Model; Integer Linear Programming; INDUSTRY;
D O I
10.23055/ijietap.2024.31.2.9717
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In today's competitive business landscape, organizations must streamline their planning and management processes for efficiency and profitability. Effective resource management, especially in the case of human resources, is crucial. Scheduling challenges in human resource management become more complex when considering worker skills. Balancing fairness for workers and the company necessitates the inclusion of additional constraints and variables, making manual problem-solving more time-consuming and complex. This study proposes a Goal Programming Method, a mathematical model that addresses both primary and goal constraints, to optimize solutions and minimize deviation variables. The case study of a real manufacturer's Banbury process department with 51 workers, 24 tasks, and two shifts has been analyzed. The mathematical model is utilized to allocate tasks, optimize worker skill utilization, and identify positions to close when worker availability falls short.
引用
收藏
页码:258 / 277
页数:20
相关论文
共 50 条
  • [31] Solving Cyclical Nurse Scheduling Problem Using Preemptive Goal Programming
    Sundari, V. E.
    Mardiyati, S.
    INTERNATIONAL SYMPOSIUM ON CURRENT PROGRESS IN MATHEMATICS AND SCIENCES 2016 (ISCPMS 2016), 2017, 1862
  • [32] Nurse Scheduling with Shift Preferences in a Surgical Suite Using Goal Programming
    Aktunc, Esra Agca
    Tekin, Elif
    INDUSTRIAL ENGINEERING IN THE INDUSTRY 4.0 ERA, 2018, : 23 - 36
  • [33] Selection of computer-integrated manufacturing technologies using a combined analytic hierarchy process and goal programming model
    Yurdakul, M
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2004, 20 (04) : 329 - 340
  • [34] Process improvement through Six Sigma with Beta correction: a case study of manufacturing company
    Gijo, E. V.
    Scaria, Johny
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 71 (1-4): : 717 - 730
  • [35] The Application of a Business Process Modeling Architecture in the Supply Chain of a Manufacturing Company: A Case Study
    Panayiotou, Nikolaos A.
    Stavrou, Vasileios P.
    Gayialis, Sotiris P.
    OPERATIONAL RESEARCH IN BUSINESS AND ECONOMICS, 2017, : 1 - 16
  • [36] Process improvement through Six Sigma with Beta correction: a case study of manufacturing company
    E. V. Gijo
    Johny Scaria
    The International Journal of Advanced Manufacturing Technology, 2014, 71 : 717 - 730
  • [37] Improving Efficiency in a Manufacturing Company using the InMotion Process
    Bosak, Martin
    Stofova, Lenka
    Szaryszova, Petra
    Tarca, Alexander
    Dugas, Jaroslav
    Klapakova, Katarina
    QUALITY-ACCESS TO SUCCESS, 2019, 20 (170): : 64 - 67
  • [38] Maintenance and Availability Study of a Manufacturing Company: Case Study of a Flour Mill Company
    Edokpia, R. O.
    Oparah, P. C.
    ADVANCES IN MATERIALS AND SYSTEMS TECHNOLOGIES IV, 2013, 824 : 584 - 594
  • [39] Scheduling of part time personnel in a university library with analytic hierarchy process and goal programming
    Supciller, Aliye Ayca
    Erbilek, Pinar
    PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2021, 27 (01): : 1 - 12
  • [40] Severe acute hepatitis in a printing company worker: A case study
    Kubo, Shoji
    Matsuzaki, Koichi
    Seki, Toshihito
    Ohsawa, Masahiko
    Kumagai, Shinji
    Endo, Ginji
    JOURNAL OF OCCUPATIONAL HEALTH, 2015, 57 (01) : 87 - 90