WORKER SCHEDULING OF BANBURY PROCESS USING GOAL PROGRAMMING: A TIRE MANUFACTURING COMPANY CASE STUDY

被引:1
|
作者
Chaihanit, Chonnipa [1 ]
Butrat, Anan [1 ]
Supsomboon, Srisawat [1 ]
机构
[1] King Mongkuts Univ Technol North Bangkok KMUTNB, Sirindhorn Int Thai German Grad Sch Engn TGGS, Bangkok, Thailand
关键词
Worker Scheduling; Shift Scheduling; Goal Programming Method; Mathematical Model; Integer Linear Programming; INDUSTRY;
D O I
10.23055/ijietap.2024.31.2.9717
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In today's competitive business landscape, organizations must streamline their planning and management processes for efficiency and profitability. Effective resource management, especially in the case of human resources, is crucial. Scheduling challenges in human resource management become more complex when considering worker skills. Balancing fairness for workers and the company necessitates the inclusion of additional constraints and variables, making manual problem-solving more time-consuming and complex. This study proposes a Goal Programming Method, a mathematical model that addresses both primary and goal constraints, to optimize solutions and minimize deviation variables. The case study of a real manufacturer's Banbury process department with 51 workers, 24 tasks, and two shifts has been analyzed. The mathematical model is utilized to allocate tasks, optimize worker skill utilization, and identify positions to close when worker availability falls short.
引用
收藏
页码:258 / 277
页数:20
相关论文
共 50 条
  • [41] Addressing strategic human resource management practices for TQM: the case of an Indian tire manufacturing company
    Verma, Pratima
    Kumar, Vimal
    Mittal, Ankesh
    Gupta, Pardeep
    Hsu, Sung Chi
    TQM JOURNAL, 2022, 34 (01): : 29 - 69
  • [42] Optimization of the food distribution process using the goal programming technique
    Godoi, Leticia Ferreira
    Aranha, Flavia Queiroga
    Coral, Mariele Colletti
    Cantane, Daniela Renata
    OPSEARCH, 2025,
  • [43] A SCHEDULING PROBLEM IN A SEMIOPEN JOB-SHOP - THE CASE OF A CORDSET MANUFACTURING COMPANY
    ALFA, AS
    DOLHUN, KL
    LI, CL
    MATHEMATICAL AND COMPUTER MODELLING, 1994, 20 (02) : 1 - 8
  • [44] Process scheduling under uncertainty using multiparametric programming
    Li, Zukui
    Ierapetritou, Marianthi G.
    AICHE JOURNAL, 2007, 53 (12) : 3183 - 3203
  • [45] A COMPARISON OF GOAL PROGRAMMING AND SIMULATION-MODEL RESULTS FOR A MULTIOBJECTIVE MULTIPERIOD MULTIPRODUCT MANUFACTURING SCHEDULING PROBLEM
    GALBRAITH, L
    MILLER, W
    COMPUTERS & INDUSTRIAL ENGINEERING, 1989, 17 : 366 - 371
  • [46] Cyclical Scheduling for Welfare Assistants Using 0-1 Goal Programming
    Rashid, Nur Rasyida Mohd
    Ismail, Wan Rosmanira
    Ismail, Norul Fadhilah
    Kapi, Azyan Yusra
    INTERNATIONAL CONFERENCE ON MATHEMATICS, ENGINEERING AND INDUSTRIAL APPLICATIONS 2014 (ICOMEIA 2014), 2015, 1660
  • [47] Staff Scheduling Problem for Advertising Fuel Stations Using Goal Programming Method
    Eren, Tamer
    Koctepe, Serkan
    Curebal, Ahmet
    JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2022, 25 (03): : 921 - 932
  • [48] A Nash bargaining model for flow shop scheduling problem under uncertainty: a case study from tire manufacturing in Iran
    Ghasem Safari
    Ashkan Hafezalkotob
    Mohammad Khalilzadeh
    The International Journal of Advanced Manufacturing Technology, 2018, 96 : 531 - 546
  • [49] A Nash bargaining model for flow shop scheduling problem under uncertainty: a case study from tire manufacturing in Iran
    Safari, Ghasem
    Hafezalkotob, Ashkan
    Khalilzadeh, Mohammad
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 96 (1-4): : 531 - 546
  • [50] Case Study of Lean Manufacturing Application in a Die Casting Manufacturing Company
    Ching, Ng Tan
    Hoe, Clarence Chan Kok
    Hong, Tang Sai
    Ghobakhloo, Morteza
    Pin, Chen Kah
    INTERNATIONAL CONFERENCE ON MATHEMATICS, ENGINEERING AND INDUSTRIAL APPLICATIONS 2014 (ICOMEIA 2014), 2015, 1660