Quay crane allocation of container terminal based on cluster analysis

被引:3
|
作者
Wang, Yu [1 ,2 ]
Huang, Youfang [1 ]
Zheng, Huiqiang [2 ]
Chang, Daofang [1 ]
机构
[1] Container Supply Chain Technology Engineering Research Center of MOE, Shanghai Maritime University, Shanghai, 201306, China
[2] College of Mechanical Engineering, Tongji University, Shanghai, 201804, China
关键词
D O I
10.4304/jsw.8.5.1201-1208
中图分类号
学科分类号
摘要
引用
收藏
页码:1201 / 1208
相关论文
共 50 条
  • [21] Model for disruption management of berth allocation & quay crane scheduling in container terminals
    Zeng, Qing-Cheng
    Hu, Xiang-Pei
    Yang, Zhong-Zhen
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2026 - 2035
  • [22] A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
    Moccia, L
    Cordeau, JF
    Gaudioso, M
    Laporte, G
    NAVAL RESEARCH LOGISTICS, 2006, 53 (01) : 45 - 59
  • [23] Skew control of a quay container crane
    Quang Hieu Ngo
    Hong, Keum-Shik
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2009, 23 (12) : 3332 - 3339
  • [24] Skew control of a quay container crane
    Quang Hieu Ngo
    Keum-Shik Hong
    Journal of Mechanical Science and Technology, 2009, 23 : 3332 - 3339
  • [25] Combined Configuration of Container Terminal Berth and Quay Crane considering Carbon Cost
    Duan, Jianguo
    Liu, Yi
    Zhang, Qinglei
    Qin, Jiyun
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021 (2021)
  • [26] Ant Colony System for Solving Quay Crane Scheduling Problem in Container Terminal
    Azza, Lajjam
    El Merouani, Mohamed
    Medouri, Adbdellatif
    PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 176 - 180
  • [27] Quay crane scheduling in container terminals
    Ng, W. C.
    Mak, K. L.
    ENGINEERING OPTIMIZATION, 2006, 38 (06) : 723 - 737
  • [28] Integrated discrete berth allocation and quay crane scheduling in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    ENGINEERING OPTIMIZATION, 2010, 42 (08) : 747 - 761
  • [29] Multi-objective optimization of container terminal scheduling considering shared operation of adjacent quay crane under quay crane failure
    Wu N.
    Wu D.
    Wang N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (01): : 331 - 339
  • [30] Berth Allocation Problem with Quay Crane Assignment for Container Terminals Based on Rolling-Horizon Strategy
    Xiao, Ling
    Hu, Zhi-Hua
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014