SPS tools for capital project planning analysis

被引:0
|
作者
Boskers N. [1 ]
AbouRizk S.M. [1 ]
机构
[1] Springwood Developments, Edmonton, AB T5N 1K4
关键词
Capital projects; Construction project planning; Intelligent forecasting; Simulation models;
D O I
10.1504/IJSPM.2010.032658
中图分类号
学科分类号
摘要
This paper presents the development of a Special Purpose Simulation (SPS) template for capital planning on large-scale infrastructure construction projects. The template targets outputs of greatest interest to the planner: project duration and cost estimate, using the Box Jenkins method of forecasting. The developed tool was tested in a case study involving roadway restructuring in Edmonton, Canada. The case study is detailed here for purposes of illustration. Seven models were simulated and analysed, showing the relative influence of fixed rates and mean rates on forecasting, and that subjective analysis procedures can cause disadvantageous decision-making. The case study was also used to perform risk analysis for the City of Edmonton. Copyright © 2010 Inderscience Enterprises Ltd.
引用
收藏
页码:58 / 66
页数:8
相关论文
共 50 条
  • [31] The Physics Analysis Tools Project for the ATLAS Experiment
    Lenzi, Bruno
    INTERNATIONAL CONFERENCE OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING 2009 (ICCMSE 2009), 2012, 1504 : 987 - 990
  • [32] Integrating system analysis and project management tools
    Gelbard, Roy
    Pliskin, Nava
    Spiegler, Israel
    International Journal of Project Management, 2002, 20 (06) : 461 - 468
  • [33] The Sioux Falls brownfields project: analysis of project issues and tools used
    Atencio, KM
    RISK ANALYSIS IV, 2004, 9 : 455 - 462
  • [34] AN OVERVIEW OF ANALYSIS TOOLS FOR INTEGRATED RESOURCE PLANNING
    ETO, JH
    ENERGY, 1990, 15 (11) : 969 - 977
  • [35] Evaluation of Resilient Practices for Capital Project Planning under Variable Budget Constraints
    Han, Fei
    Bogus, Susan M.
    Zhang, Su
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 105 - 114
  • [36] Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project
    Abeysekara, Baudhi
    Perera, Piyaruwan
    Shrestha, Gyan Kumar Chhipi
    Gunaruwan, Lalithasiri
    Kumarage, Amal
    Sadiq, Rehan
    Hewage, Kasun
    RESEARCH IN TRANSPORTATION ECONOMICS, 2021, 88
  • [37] Project valuation, capital investment and strategic alignment-tools and techniques at Anglo Platinum
    Smith, G. L.
    Pearson-Taylor, J.
    Anderson, D. C.
    Marsh, A. M.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2007, 107 (01) : 67 - 74
  • [38] Process tools for sustainable community planning: an evaluation of Florida demonstration project communities
    Ben-Zadok, Efraim
    INTERNATIONAL JOURNAL OF URBAN SUSTAINABLE DEVELOPMENT, 2010, 1 (1-2): : 64 - 88
  • [39] COMBINING QUALITATIVE AND QUANTITATIVE TOOLS IN R-AND-D PROJECT-PLANNING
    KIMBLER, DL
    FERRELL, WG
    COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 29 : 7 - 10
  • [40] Value Engineering analysis for the project of Beijing Capital Airport
    Yang Qing
    Qiu Wanhua
    2nd International Conference on Value Engineering & Technology Innovation, Proceedings, 2005, : 56 - 63