Minslack and kangaroo algorithms for fuzzy project scheduling problems

被引:0
|
作者
Atli, Omer [1 ]
Kahraman, Cengiz [2 ]
机构
[1] Aeronautics and Space Technologies Institute, Turkish Air Force Academy Yesilyurt, Bakirkoy, Istanbul 34149, Turkey
[2] Department of Industrial Engineering, Istanbul Technical University, Istanbul, Turkey
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:189 / 219
相关论文
共 50 条
  • [41] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations
    Sebt, M. H. (sebt@aut.ac.ir), 1600, Iran University of Science and Technology (11):
  • [42] Genetic algorithms to solve resource-constrained project scheduling problems with variable activity durations
    Sebt, M. H.
    Zarandi, M. H. Fazel
    Alipouri, Y.
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2013, 11 (3A) : 189 - 198
  • [43] Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms
    Lai, Peng-Jen
    Wu, Hsien-Chung
    APPLIED SOFT COMPUTING, 2011, 11 (08) : 4540 - 4550
  • [44] Γ-robust optimization of project scheduling problems
    Koster, Arie M. C. A.
    Segschneider, Jenny
    Ventsch, Nicole
    COMPUTERS & OPERATIONS RESEARCH, 2024, 161
  • [45] Progress payments in project scheduling problems
    Vanhoucke, M
    Demeulemeester, E
    Herroelen, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 148 (03) : 604 - 620
  • [46] Project scheduling: Recent models, algorithms and applications
    Rayward-Smith, VJ
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (05) : 602 - 603
  • [47] Preemption resource-constrained project scheduling problems with fuzzy random duration and resource availabilities
    Chen, Lu
    Zhang, Zhe
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) : 373 - 382
  • [48] Solve scheduling problems with a fuzzy approach
    Wang, HG
    Rooda, JE
    Haan, JF
    FUZZ-IEEE '96 - PROCEEDINGS OF THE FIFTH IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, 1996, : 194 - 198
  • [49] PROJECT SCHEDULING USING FUZZY SET CONCEPTS
    AYYUB, BM
    HALDAR, A
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1984, 110 (02): : 189 - 204
  • [50] Fuzzy finish time modeling for project scheduling
    Liu, Yu-chuan
    Yang, Shih-ming
    Lin, Yu-te
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2010, 11 (12): : 946 - 952