Γ-robust optimization of project scheduling problems

被引:1
|
作者
Koster, Arie M. C. A. [1 ]
Segschneider, Jenny [1 ]
Ventsch, Nicole [1 ]
机构
[1] Rhein Westfal TH Aachen, Res Area Discrete Optimizat, Pontdriesch 10-12, D-52056 Aachen, Germany
关键词
Robust project scheduling; Budgeted uncertainty; Two-stage robust optimization; Heuristics; Mixed-integer programming; ALGORITHM;
D O I
10.1016/j.cor.2023.106453
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we investigate the problem of finding a robust baseline schedule for the project scheduling problem under uncertain process times. We assume that the probability distribution for the duration is unknown, but an estimate is given along with an interval in which this time can vary. At most Gamma of the tasks will deviate from the estimated time. We present two approaches to solving this problem. The first approach treats the problem of determining the earliest guaranteed finish times and can be solved in polynomial time by an extension of the critical path method. The second is a two-stage approach that determines the baseline schedule in the first stage and an adaptation to the scenario in the second stage. We show strong NP-hardness of the second stage problem and introduce a novel formulation. From this formulation we derive an exact algorithm and three heuristics. A computational study on benchmark instances shows that the heuristics perform well on larger instances.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Study on a Robust Optimization Model for Project Scheduling Policies
    Zhang, Yu
    Yin, Tengfei
    MECHANICAL AND AEROSPACE ENGINEERING, PTS 1-7, 2012, 110-116 : 2866 - +
  • [2] Robust optimization models for project scheduling with resource availability cost
    Yamashita, Denise Sato
    Armentano, Vinicius Amaral
    Laguna, Manuel
    JOURNAL OF SCHEDULING, 2007, 10 (01) : 67 - 76
  • [3] Robust optimization models for project scheduling with resource availability cost
    Denise Sato Yamashita
    Vinícius Amaral Armentano
    Manuel Laguna
    Journal of Scheduling, 2007, 10 : 67 - 76
  • [4] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times
    Hu X.
    Liang S.
    Wang J.
    Cui N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
  • [5] Solving software project scheduling problems with ant colony optimization
    Xiao, Jing
    Ao, Xian-Ting
    Tang, Yong
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) : 33 - 46
  • [6] Robust Integer Optimization and Scheduling Problems for Large Electricity Consumers
    Vujanic, Robin
    Mariethoz, Sebastien
    Goulart, Paul
    Morari, Manfred
    2012 AMERICAN CONTROL CONFERENCE (ACC), 2012, : 3108 - 3113
  • [7] Tropical optimization problems in time-constrained project scheduling
    Krivulin, N.
    OPTIMIZATION, 2017, 66 (02) : 205 - 224
  • [8] Tropical optimization problems with application to project scheduling with minimum makespan
    Nikolai Krivulin
    Annals of Operations Research, 2017, 256 : 75 - 92
  • [9] Tropical optimization problems with application to project scheduling with minimum makespan
    Krivulin, Nikolai
    ANNALS OF OPERATIONS RESEARCH, 2017, 256 (01) : 75 - 92
  • [10] Robust Optimization Model of Project Scheduling Problem Based on Genetic Algorithm
    Wang, Dayong
    Li, Xiangyang
    Fang, Bingxiu
    Chou, Jinling
    PROCEEDINGS OF THE 2016 3RD INTERNATIONAL CONFERENCE ON MATERIALS ENGINEERING, MANUFACTURING TECHNOLOGY AND CONTROL, 2016, 67 : 1455 - 1461