A Process-Improvement Method for Implementing Earned Value-Based Project Management in Organizations

被引:0
|
作者
Panquet, Quentin [1 ]
Bourgault, Mario [1 ]
Pellerin, Robert [1 ]
Danjou, Christophe [1 ]
Perrier, Nathalie [1 ]
机构
[1] Polytech Montreal, Succursale Ctr Ville, Dept Math & Ind Engn, CP 6079, Montreal, PQ H3C 3A7, Canada
关键词
Earned value management (EVM); Project management; Design research methodology (DRM);
D O I
10.1061/JCEMD4.COENG-15041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project monitoring has become crucial to the success of organizations in an increasingly competitive industrial environment. As such, earned value management (EVM) is an essential part of project cost control. Over the years, the scientific literature has mainly focused on developing mathematical models to improve EVM, whereas very few researchers have examined the implementation of EVM in organizations. Although some standards provide general guidelines for implementing the methodology, they rarely consider the maturity of the organization or the strategy required to implement it. This paper aims to develop an EVM implementation plan method for organizations. The method identifies the activities to be carried out, their sequencing, and the corresponding roles, techniques, and deliverables associated with each activity. The analysis of this phase of the existing situation allows for a consideration of the organization's maturity level based on a process mapping analysis and its audit of the organization. Relevant recommendations are then identified before defining EVM implementation strategies according to the organization's needs, constraints, and resources. Interviews with professionals allowed for the verification of the relevance of the recommendations before assigning them to the defined implementation strategies at every stage of implementation. The impact of each strategy on the organization's processes is mapped and analyzed to determine the expected costs and benefits. The implementation method was tested successfully within a firm.
引用
收藏
页数:17
相关论文
共 50 条
  • [1] Incentivising project performance in the construction of new facilities Utilising the earned value-based method
    Bryde, David
    Joby, Roger
    JOURNAL OF FACILITIES MANAGEMENT, 2007, 5 (02) : 143 - +
  • [2] Determining the Factors Influencing Construction Project Management Performance Improvement through Earned Value-Based Value Engineering Strategy: A Delphi-Based Survey
    Nejatyan, Esmaeil
    Sarvari, Hadi
    Hosseini, Seyed Abbas
    Javanshir, Hassan
    BUILDINGS, 2023, 13 (08)
  • [3] VALUE-BASED MANAGEMENT OF EDUCATIONAL ORGANIZATIONS
    Trapitsin, Sergey
    Apevalova, Zoya
    Sokolova, Nina
    Trofimova, Irina
    PROFESSIONAL CULTURE OF THE SPECIALIST OF THE FUTURE, 2019, 73 : 905 - 916
  • [4] Improvement and application of earned value analysis in coal project management
    Zhong, Shuheng
    Wang, Xin
    ISMSSE 2011, 2011, 26
  • [5] Earned value project management
    Fleming, Quentin W.
    Koppelman, Joel M.
    Cost Engineering (Morgantown, West Virginia), 1997, 39 (02): : 13 - 15
  • [6] Project management: Earned value management
    Duncan, B
    TECHNOLOGY OF OBJECT-ORIENTED LANGUAGES AND SYSTEMS - TOOLS 34, PROCEEDINGS, 2000, : 513 - 514
  • [7] Optimizing Earned Value Method in Construction Project Management Based on Critical Path
    Zhang Hong
    Proceedings of 2008 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2008, : 171 - 173
  • [8] "KAIZEN" (Improvement) in Spacecraft Project Management using "Earned Value Analysis"
    Lakshman, Deepti
    Kannan, M. V.
    Bhojraj, H.
    JOURNAL OF SPACECRAFT TECHNOLOGY, 2011, 21 (01): : 21 - 30
  • [9] The Application of Improved Earned Value Management Method in Engineering Project Management
    Gao Xiuju
    MOT2009: PROCEEDINGS OF ZHENGZHOU CONFERENCE ON MANAGEMENT OF TECHNOLOGY, VOLS I AND II, 2009, : 383 - 387
  • [10] Application of improved earned value method in project management processes
    Qiao, Li-Hong
    Guo, Guang-Xin
    Yang, Zhi-Bing
    Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2010, 30 (01): : 33 - 36