Risk-Based Completion Cost Overrun Ratio Estimation in Construction Projects Using Machine Learning Classification Algorithms: A Case Study

被引:0
|
作者
Turkyilmaz, Aynur Hurriyet [1 ]
Polat, Gul [1 ]
机构
[1] Istanbul Tech Univ, Dept Civil Engn, TR-34469 Istanbul, Turkiye
关键词
classification; cost estimation; machine learning; cost overrun; case study; risk score; NEURAL-NETWORK; ESTIMATION MODEL; REGRESSION; PERFORMANCE;
D O I
10.3390/buildings14113541
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Estimating the completion cost accurately in the early phases of construction projects is critical to their success. However, cost overruns are almost inevitable due to the risks inherent in construction projects. Hence, the completion cost fluctuates throughout the execution phase and requires periodic updates. There is a need for a prompt and user-friendly completion cost estimation model that accounts for fluctuating risk scores and their impacts on the total cost during the execution phase. Machine learning (ML) techniques could address these requirements by providing effective methods for tackling dynamic systems. The proposed approach aims to predict the cost overrun ratio classes of the completion cost according to the changes in the total risk scores at any time of the project. Six classification algorithms were utilized and validated by employing 110 data points from a globally operating construction company. The performances of the algorithms were evaluated with validation and performance indices. The decision tree classifier surpassed other algorithms. Although there are some research limitations, including risk perception, data gathering restrictions, and selecting proper ML algorithms upon data properties, this research improves the planning abilities of construction executives by providing a cost overrun ratio based on changing total risk scores, facilitating swift and simple assessments at any stage of a construction project's execution.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning
    Sohrabi, Hossein
    Noorzai, Esmatullah
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (02) : 544 - 570
  • [2] Cost Estimation of Civil Construction Projects using Machine Learning Paradigm
    Arage, Sphurti S.
    Dharwadkar, Nagaraj V.
    2017 INTERNATIONAL CONFERENCE ON I-SMAC (IOT IN SOCIAL, MOBILE, ANALYTICS AND CLOUD) (I-SMAC), 2017, : 594 - 599
  • [3] Cost Estimation of Metro Construction Projects Using Interpretable Machine Learning
    Meng, Chuncheng
    Qu, Daoyuan
    Duan, Xiaochen
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2024, 38 (06)
  • [4] Machine Learning Algorithms for Construction Projects Delay Risk Prediction
    Gondia, Ahmed
    Siam, Ahmad
    El-Dakhakhni, Wael
    Nassar, Ayman H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (01)
  • [5] Risk-Based Approach to Predict the Cost Performance of Modularization in Construction Projects
    Abdul Nabi, Mohamad
    El-adaway, Islam H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (10)
  • [6] Machine learning-aided time and cost overrun prediction in construction projects: application of artificial neural network
    Al mnaseer R.
    Al-Smadi S.
    Al-Bdour H.
    Asian Journal of Civil Engineering, 2023, 24 (7) : 2583 - 2593
  • [7] Cost estimation and prediction in construction projects: a systematic review on machine learning techniques
    Tayefeh Hashemi, Sanaz
    Ebadati, Omid Mahdi
    Kaur, Harleen
    SN APPLIED SCIENCES, 2020, 2 (10):
  • [8] Cost estimation and prediction in construction projects: a systematic review on machine learning techniques
    Sanaz Tayefeh Hashemi
    Omid Mahdi Ebadati
    Harleen Kaur
    SN Applied Sciences, 2020, 2
  • [9] COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY
    Derakhshanalavijeh, Roya
    Cardoso Teixeira, Jose Manuel
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (01) : 125 - 136
  • [10] Ranking cost overrun factors in the mega hospital construction projects using Delphi-SWARA method: an Iranian case study
    Balali, Amirhossein
    Moehler, Robert C.
    Valipour, Alireza
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (13) : 2577 - 2585