Machine learning-aided time and cost overrun prediction in construction projects: application of artificial neural network

被引:0
|
作者
Al mnaseer R. [1 ]
Al-Smadi S. [2 ]
Al-Bdour H. [3 ]
机构
[1] Department of Civil Engineering, Faculty of Engineering, Al-Balqa Applied University, Al-Salt
[2] Department of Mechanical and Manufacturing Engineering, Faculty of Engineering, Universiti Putra Malaysia, Selangor
[3] Master of Engineering Project Management, Faculty of Engineering, Jadara University, Irbid
关键词
Artificial neural network; Cost overrun; Machine learning-aided; Prediction; Tabu search; Time overrun;
D O I
10.1007/s42107-023-00665-7
中图分类号
学科分类号
摘要
This research provides evidence of well-established evaluation frameworks for predicting time and cost overruns. There have been several attempts to reduce this issue, but these overruns still harm the construction industry worldwide. To create hyper-parameter-optimized predictive models, the numerical data was primarily used to train a specific type of machine learning algorithm known as an artificial neural network (ANN). In addition, Tabu Search was used to fine-tune the neural networks. Tabu Search returned a precision of 68.15826416015625, a recall of 80.6761884689331, and an accuracy of 92.19601929187775. The F1 score was 71.0405363922119. To better understand the occurrence of cost and schedule overruns, the study addressed in this article analyses 191 construction projects completed in the Hashemite Kingdom of Jordan between 2011 and 2021. The results showed that the R2 value was 0.938478 and the mean absolute error (MAE) was 0.057 for the data on cost overruns, while it was 0.9385 and the MAE was 21.7090 for the data on time overruns. Using tabular search optimization, the ANN model achieves better results than the baseline models. In sum, the neural network with tabular search optimization has proven to be a practical tool to employ in the early design phase, when there is typically a sparse or insufficient data set to conduct a cost and time overrun analysis. This approach has the potential to produce more reliable results and reduce the margin of error in estimates. © 2023, The Author(s), under exclusive licence to Springer Nature Switzerland AG.
引用
收藏
页码:2583 / 2593
页数:10
相关论文
共 50 条
  • [1] Machine learning-aided cost prediction and optimization in construction operations
    Sharma, Virok
    Zaki, Mohd
    Jha, Kumar Neeraj
    Krishnan, N. M. Anoop
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (03) : 1241 - 1257
  • [2] Prediction of Cost Overrun Risk in Construction Projects
    Plebankiewicz, Edyta
    Wieczorek, Damian
    [J]. SUSTAINABILITY, 2020, 12 (22) : 1 - 15
  • [3] Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach
    Ashtari, Mohammad Amin
    Ansari, Ramin
    Hassannayebi, Erfan
    Jeong, Jaewook
    [J]. BUILDINGS, 2022, 12 (10)
  • [4] Machine learning-aided engineering services' cost overruns prediction in high-rise residential building projects: Application of random forest regression
    Shoar, Shahab
    Chileshe, Nicholas
    Edwards, John David
    [J]. JOURNAL OF BUILDING ENGINEERING, 2022, 50
  • [5] Time Delay and Cost Overrun in Qatari Public Construction Projects
    Senouci, Ahmed
    Ismail, Alaa
    Eldin, Neil
    [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 368 - 375
  • [6] Learning-Aided Stochastic Network Optimization With State Prediction
    Huang, Longbo
    Chen, Minghua
    Liu, Yunxin
    [J]. IEEE-ACM TRANSACTIONS ON NETWORKING, 2018, 26 (04) : 1810 - 1820
  • [7] Learning-aided Stochastic Network Optimization with Imperfect State Prediction
    Huang, Longbo
    Chen, Minghua
    Liu, Yunxin
    [J]. MOBIHOC'17: PROCEEDINGS OF THE 18TH ACM INTERNATIONAL SYMPOSIUM ON MOBILE AD HOC NETWORKING AND COMPUTING, 2017,
  • [8] Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects
    Matin, Danial Mirzai
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2016, 6 (04) : 1062 - 1066
  • [9] A model utilizing the artificial neural network in cost estimation of construction projects in Jordan
    Al-Tawal, Dareen Ryied
    Arafah, Mazen
    Sweis, Ghaleb Jalil
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) : 2466 - 2488
  • [10] Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects
    Ghazal, Mai Monir
    Hammad, Ahmed
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (09) : 1632 - 1646