共 50 条
- [4] Machine learning-aided engineering services' cost overruns prediction in high-rise residential building projects: Application of random forest regression [J]. JOURNAL OF BUILDING ENGINEERING, 2022, 50
- [5] Time Delay and Cost Overrun in Qatari Public Construction Projects [J]. 5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 368 - 375
- [7] Learning-aided Stochastic Network Optimization with Imperfect State Prediction [J]. MOBIHOC'17: PROCEEDINGS OF THE 18TH ACM INTERNATIONAL SYMPOSIUM ON MOBILE AD HOC NETWORKING AND COMPUTING, 2017,