共 50 条
- [21] Risk factors influencing time and cost overrun in multiple D&B projects in Malaysia: A case study 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 854 - 859
- [23] Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study KSCE Journal of Civil Engineering, 2016, 20 : 1613 - 1620
- [25] Classification of Cardiovascular Risk Using Accelerometer Data and Machine Learning Algorithms MEDICINE AND SCIENCE IN SPORTS AND EXERCISE, 2014, 46 (05): : 717 - 717
- [29] Case Study on Model-based Application of Machine Learning using Small CAD Databases for Cost Estimation KDIR: PROCEEDINGS OF THE 11TH INTERNATIONAL JOINT CONFERENCE ON KNOWLEDGE DISCOVERY, KNOWLEDGE ENGINEERING AND KNOWLEDGE MANAGEMENT - VOL 1: KDIR, 2019, : 258 - 265
- [30] Construction cost estimation of reinforced and prestressed concrete bridges using machine learning GRADEVINAR, 2021, 73 (01): : 1 - 13