Analysis of Construction Control of Arch-shaped Pylon Alignment of High-speed Railway Arch-shaped Pylon Cable-stayed Bridge

被引:0
|
作者
Shi, Zhou [1 ]
Zhong, Meiling [1 ]
Yu, Wanqing [1 ]
Ji, Feng [1 ]
机构
[1] Southwest Jiaotong University, Chengdu,610031, China
关键词
Bending moments - Arch bridges - Cable stayed bridges - Launching - Manufacture - Arches - Iterative methods - Cables;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: The force and deformation of arch-shaped pylon structure is complex, so construction control is the key to ensure the bridge alignment. Relying on the arch-shaped pylon cable-stayed bridge of Yuanjiang extra-large bridge, the finite element model of the whole bridge is established. Firstly, the vertical rotation condition of the arch-shaped pylon is simulated using trial and error method, on the basis of it, the alignment and force of the arch-shaped pylon during the construction process under the two closure schemes of incremental launching and non-incremental launching are discussed. Research conclusions:(1) The arch-shaped pylon can balance the influence of self-weight by overturning 0.007 43 rad in swivel construction. After iteration, the arch-shaped pylon alignment under the two closure schemes can be closed, and the deviation from the design alignment is within 1 mm. The bending moment and maximum stress of the arch-shaped pylon in the non-incremental launching scheme after closing is obviously greater than that in the incremental launching scheme. (2) Under the two schemes, the maximum horizontal and vertical deviation between the manufacturing and design alignment of the arch-shaped pylon are 190.38 mm, 162.49 mm and -36.74 mm, 36.44 mm, respectively. Under the incremental launching scheme, the manufacturing alignment of the arch-shaped pylon is closer to the design alignment. (3) Under the scheme of non-incremental launching and incremental launching, the maximum bending moment of arch-shaped pylon is -60 420 kN•m, -44 452 kN•m, and the most unfavorable stress on the upper and lower edges of the arch-shaped pylon is -94.5 MPa, -176.0 MPa and -114.0 MPa, -148.0 MPa. In the incremental launching scheme, the arch-shaped pylon is basically under compression, the stress on the upper and lower edges is relatively uniform, and the force of the arch-shaped pylon is more reasonable. (4) The research results can provide reference for the construction and control of similar arch-shaped pylons. © 2021, Editorial Department of Journal of Railway Engineering Society. All right reserved.
引用
收藏
页码:22 / 27
相关论文
共 50 条
  • [41] Rotation construction of heavy swivel arch bridge for high-speed railway
    Feng, Yu
    Qi, Jianan
    Wang, Jingquan
    Zhang, Wenxue
    Zhang, Qifeng
    STRUCTURES, 2020, 26 : 755 - 764
  • [42] Seismic performance analysis of concrete-filled steel tubular single pylon cable-stayed bridge with swivel construction
    Xiao, Junhua
    Liu, Miao
    Zhong, Tieyi
    Fu, Guangzhi
    2018 INTERNATIONAL CONFERENCE ON CIVIL, ARCHITECTURE AND DISASTER PREVENTION, 2019, 218
  • [43] Stiffness and structural parameters of high-speed railway cable-stayed bridge with ballastless track
    Sun Z.
    Guo H.
    Xiang L.
    Journal of Railway Science and Engineering, 2024, 21 (05) : 1726 - 1736
  • [44] STUDY ON THE INFLUENCE OF CABLE/SLING DAMAGE ON THE NATURAL VIBRATION CHARACTERISTICS OF SPECIAL-SHAPED CABLE-STAYED ARCH BRIDGE WITHOUT BACK CABLE
    Zhang, Kexin
    Qi, Tianyu
    Xue, XingWei
    Zhu, Zhimin
    Sun, Quansheng
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2020, 30 (04): : 507 - 517
  • [45] Case Study of Twin Cable-Stayed Bridges for High-Speed Railway in China: Design, Analysis and Construction
    Dai, Gonglian
    Su, Miao
    Yan, Bin
    STRUCTURAL ENGINEERING INTERNATIONAL, 2014, 24 (03) : 396 - 401
  • [46] Application of Operation Monitoring for High-speed Railway Large-span Cable-stayed Bridge
    Cheng, Wenbin
    Journal of Railway Engineering Society, 2024, 41 (12) : 83 - 87
  • [47] Research on the Influence of Pre-camber Setting of Large Span Cable-stayed Bridge for High-speed Railway on Ballastless Track Alignment Control
    Wang, Jundong
    Journal of Railway Engineering Society, 2023, 39 (12) : 41 - 48
  • [48] Research on the Extreme Value of Cable Temperature of the High-speed Railway Cable-stayed Bridge Using Maximum Entropy
    基于最大熵模型的斜拉桥拉索温度极值研究
    Dai, Gonglian, 1600, Editorial Department of Journal of Railway Engineering Society (38): : 59 - 66
  • [49] Structure system of four-line high-speed railway cable-stayed bridge with double cable planes
    School of Architecture and Art, Central South University, Changsha 410083, China
    不详
    不详
    Zhongnan Daxue Xuebao (Ziran Kexue Ban), 2013, 4 (1603-1610):
  • [50] High-temperature Closure Control Technology of Concrete Arch Bridge Using Cable-Stayed Buckle and Cantilever Construction Method
    Tian, Zhongchu
    Peng, Wenping
    Zhou, Chao
    Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 1032 - 1037