Analysis of Construction Control of Arch-shaped Pylon Alignment of High-speed Railway Arch-shaped Pylon Cable-stayed Bridge

被引:0
|
作者
Shi, Zhou [1 ]
Zhong, Meiling [1 ]
Yu, Wanqing [1 ]
Ji, Feng [1 ]
机构
[1] Southwest Jiaotong University, Chengdu,610031, China
关键词
Bending moments - Arch bridges - Cable stayed bridges - Launching - Manufacture - Arches - Iterative methods - Cables;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: The force and deformation of arch-shaped pylon structure is complex, so construction control is the key to ensure the bridge alignment. Relying on the arch-shaped pylon cable-stayed bridge of Yuanjiang extra-large bridge, the finite element model of the whole bridge is established. Firstly, the vertical rotation condition of the arch-shaped pylon is simulated using trial and error method, on the basis of it, the alignment and force of the arch-shaped pylon during the construction process under the two closure schemes of incremental launching and non-incremental launching are discussed. Research conclusions:(1) The arch-shaped pylon can balance the influence of self-weight by overturning 0.007 43 rad in swivel construction. After iteration, the arch-shaped pylon alignment under the two closure schemes can be closed, and the deviation from the design alignment is within 1 mm. The bending moment and maximum stress of the arch-shaped pylon in the non-incremental launching scheme after closing is obviously greater than that in the incremental launching scheme. (2) Under the two schemes, the maximum horizontal and vertical deviation between the manufacturing and design alignment of the arch-shaped pylon are 190.38 mm, 162.49 mm and -36.74 mm, 36.44 mm, respectively. Under the incremental launching scheme, the manufacturing alignment of the arch-shaped pylon is closer to the design alignment. (3) Under the scheme of non-incremental launching and incremental launching, the maximum bending moment of arch-shaped pylon is -60 420 kN•m, -44 452 kN•m, and the most unfavorable stress on the upper and lower edges of the arch-shaped pylon is -94.5 MPa, -176.0 MPa and -114.0 MPa, -148.0 MPa. In the incremental launching scheme, the arch-shaped pylon is basically under compression, the stress on the upper and lower edges is relatively uniform, and the force of the arch-shaped pylon is more reasonable. (4) The research results can provide reference for the construction and control of similar arch-shaped pylons. © 2021, Editorial Department of Journal of Railway Engineering Society. All right reserved.
引用
收藏
页码:22 / 27
相关论文
共 50 条
  • [31] Numerical calculation on solar temperature field of a cable-stayed bridge with U-shaped section on high-speed railway
    Liu Wen-shuo
    Dai Gong-lian
    Rao Shao-chen
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (08) : 3345 - 3352
  • [32] Numerical calculation on solar temperature field of a cable-stayed bridge with U-shaped section on high-speed railway
    Wen-shuo Liu
    Gong-lian Dai
    Shao-chen Rao
    Journal of Central South University, 2014, 21 : 3345 - 3352
  • [33] Deformation coordination performance of ballastless track isolation layer on high-speed railway arch supported tower cable-stayed bridge
    Zheng W.
    Chen Z.
    Sheng X.
    Xu H.
    Yang Y.
    Journal of Railway Science and Engineering, 2023, 20 (11) : 4256 - 4265
  • [34] CWR longitudinal force of cable-stayed bridge of High-speed Railway
    Yan, Bin
    Dai, Gong-Lian
    Tiedao Xuebao/Journal of the China Railway Society, 2012, 34 (03): : 83 - 87
  • [35] Construction Alignment Control of Continuous Steel Truss Girder and Flexible Arch Bridge of High-speed Railway
    Lin, Pengzhen
    Liu, Yinglong
    He, Zhigang
    Journal of Railway Engineering Society, 2019, 36 (11) : 45 - 50
  • [36] Nonlinear Stress Analysis of Cable-pylon Anchorage Zones RC of Extra-dosed Cable-stayed Bridge in Railway
    Chen Xingchong
    Liu Zunwen
    Wang Changfeng
    2014 SIXTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA), 2014, : 430 - 434
  • [37] Nonlinearity stability analysis of main girder segments of three-pylon cable-stayed bridge at construction stage
    Deng, Xiao-Guang
    Lu, Zhi-Fang
    Li, Qian
    Bridge Construction, 2015, 45 (02) : 116 - 121
  • [38] Analysis of dynamic parameters of steel truss girder cable-stayed bridge with single pylon and single cable plane at construction stage
    Zeng, Yong
    Zheng, Hui-Jun
    Liu, Yan
    Zhang, Da-Wei
    Bridge Construction, 2016, 46 (04) : 35 - 39
  • [39] Analysis of fitting parameters of track regularity control of a high-speed railway cable-stayed bridge with kilometer span
    Liu, Yanlin
    Li, Zaiwei
    Tan, Shehui
    Zhendong yu Chongji/Journal of Vibration and Shock, 2024, 43 (16): : 176 - 184