Numerical modeling and fatigue analysis of the dynamic response of main pump cable in nuclear power plant

被引:0
|
作者
Jingqi, Wang [1 ]
Lixia, Guo [1 ]
Wei, Liu [2 ]
Yadong, Wang [3 ]
Dongfang, Wu [3 ]
Zimeng, Chen [2 ]
机构
[1] Jiangsu Nuclear Power Corporation, LTD, Jiangsu, Lianyungang,222000, China
[2] China Nuclear Power Operation Technology Corporation LTD, Wuhan,430200, China
[3] CNNP Operation Maintenance Technology Corporation LTD, Hangzhou,311215, China
关键词
The structural temperature rise and thermal stress caused by operation current and ambient temperature are some of the main factors affecting cable fatigue life. Combined with the operating and environmental conditions of the main cooling pump of the nuclear power plant; the thermal-structural coupling field numerical modeling and fatigue analysis of the 6kV single-core and three-core cable of the main pump is carried out. Based on obtaining the steady-state operating current; the motor start-up transient current; and the circulating ambient temperature; the thermal-structural coupling field numerical model of the main pump cable is established using the load transfer method to obtain the thermal and stress field distribution of the internal structural layer. The load history of one cycle is extracted for the fatigue numerical simulation of the main pump cable. The stress time history of the cable structure layer was constructed by the stress calculation results and the load time history of a single period; and the fatigue life of the main pump cable was obtained based on the S-N curve of the main insulation material and the Miner's linear cumulative damage theory. The simulation results show that the force acting on the main pump cable by the operating current and ambient temperature is an approximately symmetric cyclic load of constant amplitude. The life cycle of the cable can reach 2.235∗e4 times; and the overall life of the cable is about 63.97 years. This study can provide theoretical guidance for the safety and reliability design and state operation and maintenance of the main pump cable of the nuclear power plant. © 2024 Wang Jingqi et al; published by Sciendo;
D O I
10.2478/amns-2024-1848
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Numerical Analysis on the Hydraulic Thrust and Dynamic Response Characteristics of a Turbine Pump
    Kong, Linghua
    Cao, Jingwei
    Li, Xiangyang
    Zhou, Xulei
    Hu, Haihong
    Wang, Tao
    Gui, Shuxin
    Lai, Wenfa
    Zhu, Zhongfeng
    Wang, Zhengwei
    Liu, Yan
    ENERGIES, 2022, 15 (04)
  • [42] Test Method on Starting Drag Torque of the Thrust Bearing of the Reactor Main Pump in Nuclear Power Plant
    Zhang J.
    Gu J.
    Chen S.
    Wang M.
    Liu X.
    Hedongli Gongcheng/Nuclear Power Engineering, 2022, 43 (02): : 232 - 236
  • [43] Detailed modeling and transient analysis for nuclear power plant turbine
    Su, Geng
    Lin, Meng
    Yang, Yan-Hua
    Hou, Dong
    Hedongli Gongcheng/Nuclear Power Engineering, 2010, 31 (01): : 122 - 126
  • [44] Alarm Analysis for Nuclear Power Plant by a Functional Modeling Approach
    Qing, Xianguo
    Zhao, Yang
    Li, Wei
    Zhou, Ling
    Xiong, Yan
    Cheng, Bo
    2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 4780 - 4784
  • [45] DYNAMIC ANALYSIS AND RESPONSE SPECTRA FOR THE MAIN PROCESS BUILDING OF A REPROCESSING PLANT
    HILPERT, HJ
    HENKEL, FO
    NUCLEAR ENGINEERING AND DESIGN, 1988, 108 (03) : 437 - 445
  • [46] Study on Nuclear Power Plant Dynamic Response Characteristics and Impact of Power Quality Problems
    Luo, Heng
    Liu, Dichen
    Shi, Qiuyun
    Gao, Yi
    2012 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2012,
  • [47] Modeling of Thermal Fatigue Crack for Enhancement of Electromagnetic Nondestructive Evaluation of Nuclear Power Plant
    Wang, Jing
    Yusa, Noritaka
    Pan, Hongliang
    Kemppainen, Mika
    Virkkunen, Iikka
    Hashizume, Hidetoshi
    PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 1, 2014,
  • [48] Cause Analysis and Solution of Main Steam Pipe Vibration in a Nuclear Power Plant
    某核电厂主蒸汽管道振动原因分析及解决方案探讨
    Zhan, Minming (zhanminming@snerdi.com.cn), 1600, Atomic Energy Press (42): : 138 - 142
  • [49] Analysis of elemental composition of main construction materials in the nuclear power plant fugen
    Nuclear Safety Technology Center, Tokyo Toyamakaikan, 5-1-3-101 Hakusan, Bunkyou-ku, Tokyo 112-8604, Japan
    不详
    不详
    不详
    不详
    不详
    不详
    Trans. At. Energy Soc. Jpn., 1600, 4 (405-418):
  • [50] Measurement and analysis of EMI at main control room in Uljin nuclear power plant
    Song, TS
    Cho, WS
    Goo, CS
    2002 3RD INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY, 2002, : 374 - 377