Construction techniques for launching of steel cofferdam of Wangdong Changjiang River Highway Bridge

被引:0
|
作者
Zhao, Fu-Li [1 ]
Wei, Chao [1 ]
机构
[1] South China Engineering Co., Ltd., Road & Bridge International Co., Ltd., Zhongshan,528434, China
关键词
Launching;
D O I
暂无
中图分类号
学科分类号
摘要
The main bridge of Wangdong Changjiang River Highway Bridge in Chizhou City, Anhui Province is a steel and concrete composite girder cable-stayed bridge with span arrangement (78+228+638+228+78) m and the main girder is of the separated double boxes of the Pasco-Kenneiwick Bridge type. The foundation for the south pylon pier of the bridge is the one of bored piles and elevated pile cap and is constructed by the irregular double-wall steel cofferdam with unequal height cutting edges. The cofferdam is 50.4 m long, 28.4 m wide and weighs about 1 532 t. In accordance with the construction conditions of the foundation for the pylon pier, the construction scheme adopted for the foundation was that the cofferdam was launched to the river by the air bag method, the cofferdam with no bottom was arranged at the pier site first and the boring inside the cofferdam was carried out then. The cofferdam was fabricated in blocks and assembled horizontally in the shipyard and was launched to the river by the rubber air bag method. In the launching of the cofferdam, the launching speed of the cofferdam was controlled, using the reverse hauling from the ground anchors, winches and pulley blocks. The cofferdam was floated to the pier site by the tug boats and at this stage, the construction of the cofferdam in water was to be finally completed. ©, 2014, Wuhan Bridge Research Institute. All right reserved.
引用
收藏
页码:112 / 116
相关论文
共 50 条
  • [41] Erection Techniques for Steel Box Girders of Wujiagang Changjiang River Bridge in Yichang
    Sun, Qi
    Li, Hui
    Lin, Fei-Yang
    Bridge Construction, 2022, 52 (05) : 142 - 148
  • [42] Design of main navigable span bridge of Chizhou Changjiang River Highway Bridge
    China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan
    430056, China
    Bridge Constr., 4 (92-96):
  • [43] Key Construction Control Techniques for South Branch Navigation Channel Bridge of Bianyuzhou Changjiang River Bridge
    Li, Jiang-Gang
    Shi, Jian-Hua
    Zhang, Ju-Sheng
    Bridge Construction, 2022, 52 (04) : 8 - 15
  • [44] Key techniques for construction of main bridge of Tongling Changjiang River Rail-cum-Road Bridge
    Zhou, Wai-Nan
    Bridge Construction, 2014, 44 (04) : 1 - 8
  • [45] Construction Techniques for Side Span Composite Girder of Main Bridge of Qingshan Changjiang River Bridge in Wuhan
    Zhang, Chun-Xin
    Hu, Jun
    Xie, Hong-Yue
    Bridge Construction, 2019, 49 (01) : 1 - 6
  • [46] Transverse Alignment Matching Techniques for Cantilever-Assembled Wide Steel Box Girders of Wuhan Qingshan Changjiang River Highway Bridge
    Zhang, Jing
    Zhao, Quancheng
    Qi, Yuan
    Bridge Construction, 2024, 54 (02): : 139 - 144
  • [47] Key techniques for construction of open caissons of main ship channel bridge of Hutong Changjiang River Bridge
    Li, Jun-Tang
    Bridge Construction, 2015, 45 (06) : 12 - 17
  • [48] Key techniques for construction of Huanggang Changjiang River Rail-cum-Road Bridge
    Liu, Jie-Wen
    Zhang, Hong-Xin
    Zhou, Ming-Xing
    Deng, Yong-Feng
    Bridge Construction, 2013, 43 (02) : 1 - 9
  • [49] COFFERDAM CONSTRUCTION - I-205 COLUMBIA RIVER BRIDGE
    BITTNER, RB
    TRANSPORTATION ENGINEERING JOURNAL OF ASCE, 1981, 107 (06): : 613 - 623
  • [50] Temperature Control Techniques for Mass Concrete of Pile Caps of Qingshan Changjiang River Highway Bridge in Wuhan
    Wei, Jian-Feng
    Bridge Construction, 2019, 49 : 80 - 85