Construction techniques for launching of steel cofferdam of Wangdong Changjiang River Highway Bridge

被引:0
|
作者
Zhao, Fu-Li [1 ]
Wei, Chao [1 ]
机构
[1] South China Engineering Co., Ltd., Road & Bridge International Co., Ltd., Zhongshan,528434, China
关键词
Launching;
D O I
暂无
中图分类号
学科分类号
摘要
The main bridge of Wangdong Changjiang River Highway Bridge in Chizhou City, Anhui Province is a steel and concrete composite girder cable-stayed bridge with span arrangement (78+228+638+228+78) m and the main girder is of the separated double boxes of the Pasco-Kenneiwick Bridge type. The foundation for the south pylon pier of the bridge is the one of bored piles and elevated pile cap and is constructed by the irregular double-wall steel cofferdam with unequal height cutting edges. The cofferdam is 50.4 m long, 28.4 m wide and weighs about 1 532 t. In accordance with the construction conditions of the foundation for the pylon pier, the construction scheme adopted for the foundation was that the cofferdam was launched to the river by the air bag method, the cofferdam with no bottom was arranged at the pier site first and the boring inside the cofferdam was carried out then. The cofferdam was fabricated in blocks and assembled horizontally in the shipyard and was launched to the river by the rubber air bag method. In the launching of the cofferdam, the launching speed of the cofferdam was controlled, using the reverse hauling from the ground anchors, winches and pulley blocks. The cofferdam was floated to the pier site by the tug boats and at this stage, the construction of the cofferdam in water was to be finally completed. ©, 2014, Wuhan Bridge Research Institute. All right reserved.
引用
收藏
页码:112 / 116
相关论文
共 50 条
  • [21] Key Construction Control Techniques of Baijusi Changjiang River Bridge in Chongqing
    Zhou, Hao
    Zheng, Jianxin
    Zhu, Hao
    Bridge Construction, 2024, 54 (04) : 141 - 148
  • [22] Control Techniques for Cable System Construction of Wufengshan Changjiang River Bridge
    Li, Bing
    Bridge Construction, 2021, 51 (04) : 119 - 126
  • [23] Key Construction Techniques for Main Ship Channel Bridge of Hutong Changjiang River Bridge
    Li, Jun-Tang
    Pan, Dong-Fa
    Bridge Construction, 2019, 49 (05) : 9 - 14
  • [24] Construction Techniques for Stiffening Girder of Main Bridge of Yangsigang Changjiang River Bridge in Wuhan
    Li, Lu-Ping
    Li, Xing-Hua
    Luo, Rui-Hua
    Bridge Construction, 2019, 49 (06): : 7 - 12
  • [26] Construction control calculation of Yunyang highway cable-stayed bridge on Changjiang River
    Zhang, Baokui
    Yang, Jixin
    Zeng, Yan
    Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban)/Journal of Wuhan University of Technology (Transportation Science and Engineering), 2004, 28 (03):
  • [27] Safety Risk Evaluation for Qingshan Changjiang River Highway Bridge in Wuhan in Construction Stage
    武汉青山长江公路大桥施工阶段安全风险评估
    1600, Wuhan Bridge Research Institute (50): : 38 - 43
  • [28] Techniques for design, manufacturing and erection of main cables of Maanshan Changjiang River Highway Bridge
    Wu, Z.-G. (masbridge@163.com), 1600, Wuhan Bridge Research Institute (43):
  • [29] Mid-Span Closure Techniques for Main Bridge of Wuhan Qingshan Changjiang River Highway Bridge
    Yang, Wen-Ming
    Li, Yong
    Qi, Ya
    Bridge Construction, 2019, 49 (05): : 108 - 112
  • [30] Installation and Traction Techniques for Stay Cables of Qingshan Changjiang River Highway Bridge in Wuhan
    Wang, Zhi-Gang
    Qin, Yong-Xi
    Zhou, Qiang-Sheng
    Yao, Yong-Feng
    Jiang, Hua
    Bridge Construction, 2020, 50 : 133 - 138