Conductor rail overhead contact line on the folding bridge in Anklam

被引:0
|
作者
Schatkowski, Kay [1 ]
Furrer, Rico [2 ]
Wili, Urs [1 ]
机构
[1] DB Netze, Produktionsdurchführung Neustrelitz I.NP-O-D Nsz, Adolf-Friedrich-Str. 21, Neustrelitz,17235, Germany
[2] Furrer+Frey AG, Thunstr. 35, Bern 6,3000, Switzerland
来源
eb - Elektrische Bahnen | 2015年 / 113卷 / 6-7期
关键词
Overhead lines;
D O I
暂无
中图分类号
TM75 [线路及杆塔];
学科分类号
摘要
The construction of an overhead contact line on movable bridges forms a speciality within the network of DB Netz AG, since, due to the differing designs of the bridges, contact line designs adjusted to each individual application are required. For equipping the folding bridge over the navigable river Peene near Anklam DB Netz AG's experience and the know-how of the suppliers, gained in world-wide applications, was combined and an overhead contact line consisting of a conductor rail for a speed of 120km/h was installed.
引用
收藏
页码:342 / 346
相关论文
共 50 条
  • [41] Comprehensive analysis for conductor galloping of overhead transmission line and preventive measures
    Huang Jingya Central China Electric Power Testing and Research Institute
    Electricity, 1992, (04) : 45 - 50
  • [42] A proposed algorithm for an overhead transmission line conductor temperature rise calculation
    Kotni, Lahouari
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2014, 24 (04): : 578 - 596
  • [43] Calculation of the overhead transmission line conductor temperature in real operating conditions
    Bena, Lubomir
    Gall, Vladimir
    Kanalik, Martin
    Kolcun, Michal
    Margitova, Anastazia
    Meszaros, Alexander
    Urbansky, Jakub
    ELECTRICAL ENGINEERING, 2021, 103 (02) : 769 - 780
  • [44] Research on calculation method of jumper conductor in overhead power transmission line
    Niu Haijun
    Wang Jingchao
    Dong Yuming
    Zhou Lixian
    Li Xinmin
    ADVANCES IN POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 614-615 : 1600 - 1605
  • [45] Research on contact line model for rail grinding
    Li, J.-Y. (jyli@bjtu.edu.cn), 1600, Science Press (35):
  • [46] Overhead contact line system type FL 200
    Furrer, Beat
    Kocher, Martin
    Casali, Bruno
    eb - Elektrische Bahnen, 1998, 96 (1-2): : 40 - 48
  • [47] Overhead contact line design of the Lötschberg basetunnel
    Hahn, Gunter
    eb - Elektrische Bahnen, 2007, 105 (4-5): : 284 - 289
  • [48] Device for overhead contact line height and stagger measurement
    Hargas, Libor
    Sindler, Peter
    Zaborsky, L'ubomir
    2011 INTERNATIONAL CONFERENCE ON APPLIED ELECTRONICS (AE), 2011,
  • [49] Procedure for interactive designing of overhead contact line installations
    Puschmnann
    Burkert, W.
    Elektrische Bahnen, 1995, 93 (03):
  • [50] Switched electrical separations in overhead contact line systems
    Spahn, Emil
    Kapfenberger, Wolfgang
    Gupta, Anoop
    eb - Elektrische Bahnen, 2015, 113 (6-7): : 348 - 353