Disaster recovery planning and business continuity for informaticians

被引:3
|
作者
Cervone H.F. [1 ]
机构
[1] School of Public Health, University of Illinois at Chicago, Chicago, IL
来源
Cervone, H. Frank (fcervone@uic.edu) | 1600年 / Emerald Group Holdings Ltd.卷 / 33期
关键词
BCP and BIRA; Business continuity planning; Business impact and risk analysis for informatics; Disaster recovery planning; DRP; Informatics project planning; Risk prioritization in informatics projects;
D O I
10.1108/DLP-02-2017-0007
中图分类号
学科分类号
摘要
Purpose: The purpose of this paper is to address the problems associated with informatics and analytics projects that are developed in an “organic” manner. As such, this often circumvents formal project management principles and practices. The decision to do this is determined by organizational factors; however, even in an informal environment, ensuring that adequate disaster recovery and business continuity plans are in place for all mission-critical applications is vital to ensure the long-term survival prospects of an organization in the event of a disaster. Design/methodology/approach: By adapting the principles and techniques of traditional disaster recovery and business continuity planning, an informatician can develop plans that integrate the requirements of their projects into a larger, organization-wide plan to recover from incidents and ensure continuity of business operations. Findings: The use of disaster recovery planning and business continuity planning can help ensure the long-term viability of informatics and analytics projects within an organization. Originality/value: Most business continuity planning is focused on projects that are formally developed and relatively large in scale. This paper applies these principles and practices to informatics and analytics projects that are developed informally and managed casually. Thorough an example, the point that more traditional disaster recovery and continuity practices can and should be applied in this less-formal environment is demonstrated. © 2017, © Emerald Publishing Limited.
引用
收藏
页码:78 / 81
页数:3
相关论文
共 50 条
  • [41] Urban Planning for Disaster Recovery
    Minnery, John
    [J]. URBAN POLICY AND RESEARCH, 2018, 36 (04) : 527 - 529
  • [42] PLANNING FOR RECOVERY AFTER DISASTER
    GREENSPA.S
    [J]. WESTERN PLASTICS, 1969, 16 (04): : 50 - &
  • [43] Network Planning for Disaster Recovery
    Bianco, Andrea
    Finochietto, Jorge
    Giraudo, Luca
    Modesti, Marco
    Neri, Fabio
    [J]. PROCEEDINGS OF THE 2008 16TH IEEE WORKSHOP ON LOCAL AND METROPOLITAN AREA NETWORKS, 2008, : 43 - +
  • [44] Disaster Recovery and Data Centre Operational Continuity
    Bejar, J. Caballero
    Caramarcu, C.
    De Stefano, J., Jr.
    Ernst, M.
    Fetzko, J.
    Gamboa, C.
    Hollowell, C.
    Hover, J.
    Kandasamy, S.
    Karasawa, M.
    Liu, Z.
    Misawa, S.
    Strecker-Kellogg, W.
    Rind, O.
    Smith, J.
    Wlodek, T.
    Wong, A.
    Yu, D.
    Zaytsev, A.
    Zhao, X.
    [J]. 20TH INTERNATIONAL CONFERENCE ON COMPUTING IN HIGH ENERGY AND NUCLEAR PHYSICS (CHEP2013), PARTS 1-6, 2014, 513
  • [45] Case study: Business continuity planning
    Klapetzky, Fred
    [J]. SCIENTIST, 2006, 20 (11): : 42 - 43
  • [46] A project planning process for business continuity
    Karakasidis, K
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 1997, 97 (7-8) : 320 - +
  • [47] Business Continuity Management Planning Methodology
    Heng, Goh Moh
    [J]. INTERNATIONAL JOURNAL OF DISASTER RECOVERY AND BUSINESS CONTINUITY, 2015, 6 : 9 - 16
  • [48] Business Continuity Planning and Information Evaluation
    Mlynek, Jaroslav
    [J]. PROCEEDINGS OF THE 26TH INTERNATIONAL CONFERENCE ON MATHEMATICAL METHODS IN ECONOMICS 2008, 2008, : 361 - 366
  • [49] PROACTIVE IT/IS MONITORING FOR BUSINESS CONTINUITY PLANNING
    Simonova, Stanislava
    Sprync, Ondrej
    [J]. E & M EKONOMIE A MANAGEMENT, 2011, 14 (03): : 57 - 65
  • [50] Project planning process for business continuity
    KPMG, Melbourne
    [J]. Ind Manage Data Sys, 7-8 (320-326):