Disaster recovery planning and business continuity for informaticians

被引:3
|
作者
Cervone H.F. [1 ]
机构
[1] School of Public Health, University of Illinois at Chicago, Chicago, IL
来源
Cervone, H. Frank (fcervone@uic.edu) | 1600年 / Emerald Group Holdings Ltd.卷 / 33期
关键词
BCP and BIRA; Business continuity planning; Business impact and risk analysis for informatics; Disaster recovery planning; DRP; Informatics project planning; Risk prioritization in informatics projects;
D O I
10.1108/DLP-02-2017-0007
中图分类号
学科分类号
摘要
Purpose: The purpose of this paper is to address the problems associated with informatics and analytics projects that are developed in an “organic” manner. As such, this often circumvents formal project management principles and practices. The decision to do this is determined by organizational factors; however, even in an informal environment, ensuring that adequate disaster recovery and business continuity plans are in place for all mission-critical applications is vital to ensure the long-term survival prospects of an organization in the event of a disaster. Design/methodology/approach: By adapting the principles and techniques of traditional disaster recovery and business continuity planning, an informatician can develop plans that integrate the requirements of their projects into a larger, organization-wide plan to recover from incidents and ensure continuity of business operations. Findings: The use of disaster recovery planning and business continuity planning can help ensure the long-term viability of informatics and analytics projects within an organization. Originality/value: Most business continuity planning is focused on projects that are formally developed and relatively large in scale. This paper applies these principles and practices to informatics and analytics projects that are developed informally and managed casually. Thorough an example, the point that more traditional disaster recovery and continuity practices can and should be applied in this less-formal environment is demonstrated. © 2017, © Emerald Publishing Limited.
引用
收藏
页码:78 / 81
页数:3
相关论文
共 50 条
  • [31] PLANNING FOR DISASTER RECOVERY
    CURRY, JP
    [J]. INFOSYSTEMS, 1978, 25 (03): : 64 - &
  • [32] Disaster recovery and business continuity after the 2010 flood in Pakistan: Case of small businesses
    Asgary, Ali
    Anjum, Muhammad Imtiaz
    Azimi, Nooreddin
    [J]. INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2012, 2 : 46 - 56
  • [33] World Marrow Donor Association Crisis Response, Business Continuity, and Disaster Recovery Guidelines
    Pingel, Julia
    Case, Cullen, Jr.
    Amer, Beth
    Hornung, Raymond A., III
    Schmidt, Alexander H.
    [J]. BIOLOGY OF BLOOD AND MARROW TRANSPLANTATION, 2012, 18 (12) : 1785 - 1789
  • [34] Business continuity planning methodology
    Lindstrom, John
    Samuelsson, Soren
    Hagerfors, Ann
    [J]. DISASTER PREVENTION AND MANAGEMENT, 2010, 19 (02) : 243 - 255
  • [35] Personal Business Continuity Planning
    Kadam, Avinash
    [J]. INFORMATION SECURITY JOURNAL, 2010, 19 (01): : 4 - 10
  • [36] Business continuity and availability planning
    Bennett, John
    [J]. Infosecurity, 2007, 4 (03)
  • [37] Business Continuity & Recovery Strategies
    Galloway, Merrilee
    Dyment, Mark
    [J]. GENETIC ENGINEERING & BIOTECHNOLOGY NEWS, 2009, 29 (05): : 58 - 58
  • [38] From Hot Ashes to a Cool Recovery: Reducing Risk by Acting on Business Continuity and Disaster Recovery Lessons Learned
    Blanke, Sandra J.
    McGrady, Elizabeth
    [J]. HOME HEALTH CARE MANAGEMENT AND PRACTICE, 2012, 24 (02): : 73 - 80
  • [39] Business Continuity and Disaster Management for Industrial Installations
    Guidry, Paul E. Eddie
    Vaughn, David
    Anderson, Richard P., Jr.
    Flores, Janet
    [J]. 2013 RECORD OF CONFERENCE PAPERS INDUSTRY APPLICATIONS SOCIETY 60TH ANNUAL IEEE PETROLEUM AND CHEMICAL INDUSTRY TECHNICAL CONFERENCE (PCIC), 2013,
  • [40] The role of public sector asset managers in responding to climate change Disaster and business continuity planning
    Warren, Clive M. J.
    [J]. PROPERTY MANAGEMENT, 2010, 28 (04) : 245 - +