Hybrid algorithm for hot strip mill rolling scheduling problem

被引:0
|
作者
Gao, Huimin [1 ]
Zeng, Jianchao [2 ]
Sun, Guoji [1 ]
机构
[1] Sch. of Electron. and Info. Eng., Xi'an Jiaotong Univ., Xi'an 710049, China
[2] Div. of Syst. Simulation, Taiyuan Heavy Machinery Inst., Taiyuan 030000, China
关键词
Genetic algorithms - Mathematical models - Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
A mathematical model of hot strip mill rolling scheduling problem (HSMRSP) is formulated. A hybrid heuristic method is proposed based on parallel strategy. The approach consists of three stages. The first stage is to classify and sort production orders to generate an initial solution by applying the domain expertise. The second is to improve the initial solutions with genetic algorithm (GA). The third is to generate the final results by adopting tabu search (TS) based on swaps of single slab and slab group. Computational results show that the proposed method is feasible and valid.
引用
收藏
页码:1291 / 1294
相关论文
共 50 条
  • [21] Stochastic Stability of Hot Strip Rolling Mill Rolls
    Xu, Baoyu
    Liu, Yilun
    Wang, Xudong
    Wang, Yuqing
    OPTICAL, ELECTRONIC MATERIALS AND APPLICATIONS, PTS 1-2, 2011, 216 : 698 - +
  • [22] ASYMMETRIC HOT-ROLLING ON WIDE STRIP MILL
    SVICHINSKII, AG
    BINKEVICH, EV
    MAZUR, VL
    GOLUBENKO, AK
    STEEL IN TRANSLATION, 1992, 22 (11) : 494 - 496
  • [23] Structural integrity of hot strip mill rolling rolls
    Belzunce, FJ
    Ziadi, A
    Rodriguez, C
    ENGINEERING FAILURE ANALYSIS, 2004, 11 (05) : 789 - 797
  • [24] Optimization Of Hot Strip Finish Rolling Mill Schedule
    Zhu Yu
    Cheng Xianmin
    Wang Tao
    PROCEEDINGS OF THE 2016 6TH INTERNATIONAL CONFERENCE ON MACHINERY, MATERIALS, ENVIRONMENT, BIOTECHNOLOGY AND COMPUTER (MMEBC), 2016, 88 : 1692 - 1696
  • [25] Nonlinear predictive control of hot strip rolling mill
    Cannon, M
    Kouvaritakis, B
    Grimble, M
    Bulut, B
    INTERNATIONAL JOURNAL OF ROBUST AND NONLINEAR CONTROL, 2003, 13 (3-4) : 365 - 380
  • [26] Analysis of vibration of aluminum strip hot rolling mill
    Tang, Huaping
    Wu, Yunxin
    Duan, Jian
    Yan, Hengzhi
    Zhendong Ceshi Yu Zhenduan/Journal of Vibration, Measurement and Diagnosis, 2002, 22 (02):
  • [27] Generating various rolling schedules for the Hot Strip Mill
    Li, PYF
    4TH WORLD CONGRESS OF EXPERT SYSTEMS, VOL 1 AND 2: APPLICATION OF ADVANCED INFORMATION TECHNOLOGIES, 1998, : 84 - 90
  • [28] Research and application of multiple constrained hot strip mill scheduling problem based on HPSA
    Lilan Liu
    Chao Liu
    Xuewei Liu
    Sen Wang
    Wei Zhou
    Zhenyou Zhang
    The International Journal of Advanced Manufacturing Technology, 2015, 81 : 1817 - 1829
  • [29] The Hot Strip Mill Scheduling Problem With Uncertainty: Robust Optimization Models and Solution Approaches
    Zhang, Rui
    Song, Shiji
    Wu, Cheng
    IEEE TRANSACTIONS ON CYBERNETICS, 2023, 53 (07) : 4079 - 4093
  • [30] A GRASP heuristic for the hot strip mill scheduling problem under consideration of energy consumption
    Puttkammer K.
    Wichmann M.G.
    Spengler T.S.
    Journal of Business Economics, 2016, 86 (5) : 537 - 573