共 50 条
- [24] Research on Multi-Dimensional Closed-Loop Management and Control Mode of Schedule Investment for Power Grid Infrastructure Projects [J]. 2019 5TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2019, 295
- [25] EARNED SCHEDULE AND THE USE OF SCHEDULE EXECUTION REPORTING METRICS [J]. PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 2, 2018,
- [26] To schedule or not to schedule? Agentic and cooperative teams at call centers [J]. FRONTIERS IN PSYCHOLOGY, 2014, 5
- [27] Using schedule variance as the only measure of schedule performance [J]. Cost Engineering (Morgantown, West Virginia), 1993, 35 (10): : 35 - 40
- [28] EFFECTS OF DRIVE, REINFORCEMENT SCHEDULE, AND CHANGE OF SCHEDULE ON PERFORMANCE [J]. JOURNAL OF EXPERIMENTAL PSYCHOLOGY, 1965, 69 (03): : 292 - 297