共 50 条
- [8] EARNED SCHEDULE AND THE USE OF SCHEDULE EXECUTION REPORTING METRICS [J]. PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 2, 2018,
- [9] To schedule or not to schedule? Agentic and cooperative teams at call centers [J]. FRONTIERS IN PSYCHOLOGY, 2014, 5
- [10] Using schedule variance as the only measure of schedule performance [J]. Cost Engineering (Morgantown, West Virginia), 1993, 35 (10): : 35 - 40