Gotthard Base Tunnel - Choice of the tunnel system from today's point of view

被引:0
|
作者
Vetsch H.-P. [1 ]
Zbinden P. [2 ]
Märki E. [3 ]
Ehrbar H. [4 ]
机构
[1] Vetsch Rail Consulting GmbH, Südstrasse 5, Bützberg
[2] Freihofstrasse 11, Erlenbach ZH
[3] Burgackerweg 13, Bremgarten
[4] Heinz Ehrbar Partners GmbH, Holzwiesstrasse 12, Herrliberg
来源
Geomechanik und Tunnelbau | 2016年 / 9卷 / 02期
关键词
Decision making; Entscheidungsfindung; General; -; Allgemeines; Simulation calculations; Simulationsrechnungen; System decision; Systementscheidung;
D O I
10.1002/geot.201600006
中图分类号
学科分类号
摘要
The historic rail tunnels in the Alps were consistently built in the form of single-tube twin-track tunnels, starting with the Mont Cenis Tunnel (1871). Only the 19.8 km long Simplon Tunnel at the start of the 20th century was built with two separate single-track tunnels. In 1988, the 53.8 km long Seikan Tunnel became the first tunnel more than 50 km long to go into operation - once more as a twin-track tunnel, although with additional constructional elements such as forced ventilation, emergency stations and a service tunnel. In 1994 followed the Channel Tunnel with a system of two single-track tunnels and a service or safety tunnel as well as a complex ventilation system. For the base tunnels through the Alps, the question arose in Switzerland at the start of the 1990s, what is the optimal tunnel system considering the requirements of construction, safety and operation? A cost-benefit analysis resulted in a system with two single-track tunnels and multi-function stations at the third points as the optimum. Meanwhile, various requirements have been newly formulated so that the question arises whether the same decision would be made with the knowledge available today. © 2016 Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH & Co. KG, Berlin.
引用
收藏
页码:79 / 93
页数:14
相关论文
共 50 条
  • [41] The Exit of the Tunnel: Yeast Alcohol Dehydrogenase from the Acceptor's Point of View
    Roston, Daniel
    Kohen, Amnon
    BIOPHYSICAL JOURNAL, 2009, 96 (03) : 441A - 441A
  • [42] Protecting overlaps from pantographs at standstill - From the experience in the Gotthard base tunnel to a generally applicable solution
    Schutz von Fahrleitungs-Parallelführungen bei stehenbleibenden Stromabnehmern - Von den Erfahrungen im Gotthard-Basistunnel zur netzweiten Lösung bei den SBB
    1600, DIV Deutscher Industrieverlag GmbH (115): : 6 - 7
  • [43] Gotthard Base Tunnel: UDEC Simulations of Micro Tremors Encountered During Construction
    Hagedorn, H.
    Stadelmann, R.
    ANALYSIS OF DISCONTINUOUS DEFORMATION: NEW DEVELOPMENTS AND APPLICATIONS, 2010, : 373 - 380
  • [44] Findings from the geodetic Long-Term Monitoring in the Construction of the Gotthard-Base Tunnel
    Salvini, Dante
    Studer, Mario
    Ryf, Adrian
    WASSERWIRTSCHAFT, 2016, 106 (09) : 22 - 26
  • [45] Water-rock interactions at the new Gotthard rail base tunnel, Switzerland
    Seelig, Ulrike
    Stober, Ingrid
    Bucher, Kurt
    GEOCHIMICA ET COSMOCHIMICA ACTA, 2007, 71 (15) : A912 - A912
  • [46] Performance of penetration models for hard rock TBMs in the case of the Gotthard Base Tunnel
    Cheda, J.
    Schuerch, R.
    Perazzelli, P.
    Mezger, F.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1165 - 1170
  • [47] GOTTHARD-BASE TUNNEL, SECTION FAIDO PREVIOUS EXPERIENCE WITH THE USE OF THE TBM
    Herrenknecht, Martin
    Boeckli, Olivier
    Baeppler, Karin
    2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 1182 - 1205
  • [48] Kralovo Pole tunnel in Brno - Expectations and Reality from the Designer's Point of View
    Horak, V.
    Kosik, L.
    Pechman, J.
    Rozek, J.
    Transport and City Tunnels - Proceedings of the 11th International Conference Underground Constructions Prague 2010, 2010, : 127 - 133
  • [49] Prediction of in situ stresses based on observations and back analyses: Piora-Mulde exploratory tunnel, Gotthard Base Tunnel Project
    Brox, DR
    Hagedorn, H
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 1047 - 1052
  • [50] Water deep inside the mountains: Unique water samples from the Gotthard rail base tunnel, Switzerland
    Bucher, Kurt
    Stober, Ingrid
    Seelig, Ulrike
    CHEMICAL GEOLOGY, 2012, 334 : 240 - 253