共 50 条
- [22] Risk management during construction of the Gotthard Base Tunnel GEOTECHNICAL MEASUREMENTS AND MODELLING, 2003, : 267 - 272
- [23] Extensive concrete and shotcrete systems for the world's longest tunnel (Gotthard base tunnel-56km) NORTH AMERICAN TUNNELING 2008, PROCEEDINGS, 2008, : 62 - 68
- [24] Convergences and core extrusions during construction of the Gotthard Base Tunnel HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1639 - 1644
- [25] Gotthard Base Tunnel: Work progress at the five construction sections UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1223 - 1228
- [26] Materials management at the gotthard base tunnel - Experience from 15 years of construction Geomechanik und Tunnelbau, 2009, 2 (05): : 619 - 626
- [27] Coordinated extension of the railway power supply of the Gotthard Base Tunnel Werner, Gunnar (gunnar.werner@sbb.ch), 1600, DIV Deutscher Industrieverlag GmbH (115): : 6 - 7
- [28] Verification of rock temperature prediction along the Gotthard base tunnel - a prospect for coming tunnel projects UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1714 - 1721