共 50 条
- [1] The main-channel restoration objective and the relevant flow regime required for the lower Yellow River [J]. CHINESE SCIENCE BULLETIN, 2006, 51 : 210 - 217
- [2] Impact of Channel Shrinkage on Flood Routing along the Lower Yellow River [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL III, 2007, : 240 - 248
- [5] Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015 [J]. Journal of Geographical Sciences, 2020, 30 : 468 - 487
- [6] Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015 [J]. Dili Xuebao/Acta Geographica Sinica, 2019, 74 (11): : 2411 - 2427
- [7] Simulation of the main-channel cross-section geometry of the Lower Yellow River in response to water and sediment changes [J]. Dili Xuebao/Acta Geographica Sinica, 2020, 75 (07): : 1494 - 1511
- [8] A Confirmation of Basic Main Channel for Flood Discharge and Sediment Transport in the Lower Yellow River [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL YELLOW RIVER FORUM ON KEEPING HEALTHY LIFE OF THE RIVER, VOL II, 2005, : 112 - 116
- [10] Analysis on Required Runoff to Maintain the Main Channel for Medium Flood in the Lower Weihe River [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL III, 2007, : 344 - 348