共 40 条
- [2] Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015 [J]. Journal of Geographical Sciences, 2020, 30 : 468 - 487
- [3] Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015 [J]. Dili Xuebao/Acta Geographica Sinica, 2019, 74 (11): : 2411 - 2427
- [4] Lower yellow river after the xiaolangdi reservoir operation [J]. Shuikexue Jinzhan/Advances in Water Science, 2019, 30 (02): : 198 - 209
- [5] Characteristics of Ice Conditions in the Lower Yellow River after the Operation of Xiaolangdi Reservoir [J]. ICE RESEARCH FOR A SUSTAINABLE ENVIRONMENT, VOLS I & II, 2012, : 419 - 426
- [6] Ice Flood Control of Lower Yellow River after Operation of Xiaolangdi Reservoir [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL III, 2007, : 289 - +
- [7] Channel Incision in the Braided Reach of the Lower Yellow River in Response to the Operation of the Xiaolangdi Reservoir [J]. PROCEEDINGS OF THE 39TH IAHR WORLD CONGRESS, 2022, : 1054 - 1059
- [8] Research on Applicability of Lower Yellow River Training Works after Beginning of Xiaolangdi Reservoir Operation [J]. 2012 INTERNATIONAL CONFERENCE ON MODERN HYDRAULIC ENGINEERING, 2012, 28 : 776 - 780
- [9] Flood volume required for keeping the main-channel from shrinkage in the lower Yellow River [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2007, 38 (09): : 1140 - 1144
- [10] Morphological effects of the operation of Xiaolangdi Reservoir on the Lower Yellow River in recent years [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2024, 55 (05): : 505 - 515