Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015

被引:29
|
作者
Wang, Yanjun [1 ]
Wu, Baosheng [1 ]
Zhong, Deyu [1 ]
机构
[1] Tsinghua Univ, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
lower Yellow River; changes in water and sediment conditions; Xiaolangdi Reservoir; geometry of main channel; WATER-SEDIMENT REGULATION; LOWER REACHES; BANKFULL DISCHARGE; REGULATION SCHEME; BRAIDED REACH; LOAD; IMPACTS; HUANGHE; DELTA;
D O I
10.1007/s11442-020-1738-3
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
Based on the measured discharge, sediment load, and cross-sectional data from 1986 to 2015 for the lower Yellow River, changes in the morphological parameters (width, depth, and cross-sectional geomorphic coefficient) of the main channel are analyzed in this paper. The results show that before the operation of the Xiaolangdi Reservoir (XLDR) from 1986 to 1999, the main channel shrunk continually, with decreasing width and depth. The rate of reduction in its width decreased along the river whereas that of depth increased in the downstream direction. Because the rate of decrease in the width of the main channel was greater than that in channel depth, the cross-sectional geomorphic coefficient decreased in the sub-reach above Gaocun. By contrast, for the sub-reach below Gaocun, the rate of decrease in channel width was smaller than that in channel depth, and the cross-sectional geomorphic coefficient increased. Once the XLDR had begun operation, the main channel eroded continually, and both its width and depth increased from 2000 to 2015. The rate of increase in channel width decreased in the longitudinal direction, and the depth of the main channel in all sub-reaches increased by more than 2 m. Because the rate of increase in the depth of the main channel was clearly larger than that of its width, the cross-sectional geomorphic coefficient decreased in all sub-reaches. The cross-sectional geometry of the main-channel of the lower Yellow River exhibited different adjustment patterns before and after the XLDR began operation. Before its operation, the main channel mainly narrowed in the transverse direction and silted in the vertical direction in the sub-reach above Aishan; in the sub-reach below Aishan, it primarily silted in the vertical direction. After the XLDR began operation, the main channel adjusted by widening in the transverse direction and deepening in the vertical direction in the sub-reach above Aishan; in the sub-reach below it, the main channel adjusted mainly by deepening in the vertical direction. Compared with the rates of decrease in the width and depth of the main channel during the siltation period, the rate of increase in channel width during the scouring period was clearly smaller while the rate of increase in channel depth was larger. After continual siltation and scouring from 1986 to 2015, the cross-sectional geometry of the main-channel changed from wide and shallow to relatively narrow and deep. The pattern of adjustment in the main channel was closely related to the water and sediment conditions. For the braided reach, the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with suspended sediment concentration (SSC) during the siltation period. By contrast, the cross-sectional geomorphic coefficient was positively correlated with discharge and negatively correlated with SSC during the scouring period. For the transitional and meandering reaches, the cross-sectional geomorphic coefficient was negatively correlated with discharge and positively correlated with SSC.
引用
收藏
页码:468 / 486
页数:19
相关论文
共 40 条
  • [1] Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015
    WANG Yanjun
    WU Baosheng
    ZHONG Deyu
    [J]. Journal of Geographical Sciences, 2020, 30 (03) : 468 - 486
  • [2] Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015
    Yanjun Wang
    Baosheng Wu
    Deyu Zhong
    [J]. Journal of Geographical Sciences, 2020, 30 : 468 - 487
  • [3] Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015
    Wang, Yanjun
    Wu, Baosheng
    Shen, Guanqing
    [J]. Dili Xuebao/Acta Geographica Sinica, 2019, 74 (11): : 2411 - 2427
  • [4] Lower yellow river after the xiaolangdi reservoir operation
    Wang, Yingzhen
    Xia, Junqiang
    Zhou, Meirong
    Li, Jie
    [J]. Shuikexue Jinzhan/Advances in Water Science, 2019, 30 (02): : 198 - 209
  • [5] Characteristics of Ice Conditions in the Lower Yellow River after the Operation of Xiaolangdi Reservoir
    Huo, Shiqing
    Chen, Dongling
    Rao, Suqiu
    [J]. ICE RESEARCH FOR A SUSTAINABLE ENVIRONMENT, VOLS I & II, 2012, : 419 - 426
  • [6] Ice Flood Control of Lower Yellow River after Operation of Xiaolangdi Reservoir
    Mingqian, Dai
    Jiangfeng, Liang
    Tao, Yu
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL III, 2007, : 289 - +
  • [7] Channel Incision in the Braided Reach of the Lower Yellow River in Response to the Operation of the Xiaolangdi Reservoir
    Li, Jie
    Zhang, Yi
    Zhou, Zhehan
    Chu, Minghao
    Zhu, Chenghao
    [J]. PROCEEDINGS OF THE 39TH IAHR WORLD CONGRESS, 2022, : 1054 - 1059
  • [8] Research on Applicability of Lower Yellow River Training Works after Beginning of Xiaolangdi Reservoir Operation
    Li Yongqiang
    Wang Baomin
    Liu Yun
    [J]. 2012 INTERNATIONAL CONFERENCE ON MODERN HYDRAULIC ENGINEERING, 2012, 28 : 776 - 780
  • [9] Flood volume required for keeping the main-channel from shrinkage in the lower Yellow River
    Liu, Xiao-Yan
    Shen, Guan-Qing
    Li, Xiao-Ping
    Zhang, Yuan-Feng
    [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2007, 38 (09): : 1140 - 1144
  • [10] Morphological effects of the operation of Xiaolangdi Reservoir on the Lower Yellow River in recent years
    Wang, Yuanjian
    Wang, Qiang
    Liu, Yanhui
    Liu, Gang
    Jiang, Enhui
    [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2024, 55 (05): : 505 - 515