Performance measurement of R and D projects in a multi-project, concurrent engineering environment

被引:102
|
作者
Pillai, A.Sivathanu [1 ]
Joshi, A. [2 ,3 ]
Rao, K.Srinivasa [1 ]
机构
[1] Defence Research and Development Organisation, Sena Bhavan, New Delhi - 110 0011, India
[2] Management Faculty, University of Pune, India
[3] Indian Institute of Cost and Management Studies and Research, 85/1, Chiplunkar Road, Erandavane, Pune - 411 004, India
关键词
Costs - Life cycle - Marketing - Performance - Research and development management;
D O I
10.1016/S0263-7863(00)00056-9
中图分类号
学科分类号
摘要
An R nad D Project can be characterized by its life cycle with three phases of evolution, viz., Project Selection Phase (Screening, Evaluation, Selection), Project Execution Phase (Technology Development, Product Development, Performance Demonstration) and Implementation Phase (Production, Marketing, Sales). The traditional approach of performance measurement deals with each of these phases in isolation. As a result, the evaluation models and performance measurement criteria are separate for each phase. Once a project is selected, all attention is focused on its completion within the stipulated time and cost, without much consideration to either the assumptions made at the time of project selection or the requirements of the implementation phase. As a result, performance measurement system for project execution phase is totally independent of other phases. In an R&D environment with high uncertainty and complexity, coupled with multiple projects competing for limited common resources, use of different models of evaluation at different phases may lead to incorrect assessment and poor overall performance. This paper addresses this important issue and suggests a framework for an Integrated Performance Index encompassing the entire lifecycle of R&D projects. The framework identifies the key factors in each phase of the project lifecycle and integrates them through a formula to derive an Integrated Performance Index that can be used to measure the overall performance of a project at any point of time during its life cycle. © 2001 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:165 / 177
相关论文
共 50 条
  • [21] Proactive and Reactive Multi-Project Scheduling in Uncertain Environment
    Wang, Weixin
    Ge, Xianlong
    Li, Lvcheng
    Su, Jiafu
    [J]. IEEE ACCESS, 2019, 7 : 88986 - 88997
  • [22] Optimization of business process assignment in multi-project environment
    Zhou, Yong-Hua
    Chen, Yu-Liu
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2003, 9 (06): : 436 - 443
  • [23] ESTIMA, a tool for EST management in a multi-project environment
    Charu G Kumar
    Richard LeDuc
    George Gong
    Levan Roinishivili
    Harris A Lewin
    Lei Liu
    [J]. BMC Bioinformatics, 5
  • [24] ESTIMA, a tool for EST management in a multi-project environment
    Kumar, CG
    LeDuc, R
    Gong, G
    Roinishivili, L
    Lewin, HA
    Liu, L
    [J]. BMC BIOINFORMATICS, 2004, 5 (1)
  • [25] Robust Scheduling Subject to Multi-project Environment Constraints
    Bocewicz, Grzegorz
    Bzdyra, Krzysztof
    Banaszak, Zbigniew
    [J]. CHALLENGES IN AUTOMATION, ROBOTICS AND MEASUREMENT TECHNIQUES, 2016, 440 : 115 - 126
  • [26] Technologizing discourse to standardize projects in multi-project organizations:: Hegemony by consensus?
    Räisänen, C
    Linde, A
    [J]. ORGANIZATION, 2004, 11 (01) : 101 - 121
  • [27] Multi-project Scrum Methodology for Projects Using Software Product Lines
    Turek, Michal
    Werewka, Jan
    [J]. INFORMATION SYSTEMS ARCHITECTURE AND TECHNOLOGY, ISAT 2015, PT III, 2016, 431 : 189 - 199
  • [28] Multi-project management in Software Engineering using simulation modelling
    Lee, B
    Miller, J
    [J]. SOFTWARE QUALITY JOURNAL, 2004, 12 (01) : 59 - 82
  • [29] Multi-Project Management in Software Engineering Using Simulation Modelling
    Bengee Lee
    James Miller
    [J]. Software Quality Journal, 2004, 12 : 59 - 82
  • [30] Modeling the Transformation of Configuration Management Processes in a Multi-Project Environment
    Dotsenko, Nataliia
    Chumachenko, Igor
    Galkin, Andrii
    Kuchuk, Heorhii
    Chumachenko, Dmytro
    [J]. SUSTAINABILITY, 2023, 15 (19)