Robust Scheduling Subject to Multi-project Environment Constraints

被引:3
|
作者
Bocewicz, Grzegorz [1 ]
Bzdyra, Krzysztof [1 ]
Banaszak, Zbigniew [2 ]
机构
[1] Koszalin Univ Technol, Dept Comp Sci & Management, Sniadeckich 3, PL-75453 Koszalin, Poland
[2] Warsaw Univ Technol, Dept Business Informat, Narbutta 85, PL-02524 Warsaw, Poland
关键词
Robust scheduling; Declarative modeling; Multimode resource-constrained multi-product scheduling problem; ALGORITHM;
D O I
10.1007/978-3-319-29357-8_11
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The main objective is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multi project-like and mass customized oriented multi-product scheduling. Its formal representation enables to formulate the straight and reverse problem scheduling of a newly inserted orders portfolio subject to constraints imposed by an enterprise multi-project environment. Considered problems correspond to the routine questions faced by decision makers and are formulated either in the straight or reverse way, e. g. Is it possible to undertake a new portfolio under given resources availability (e. g. constrained in time) while guaranteeing disturbance-free execution of the already executed portfolios? What values and of what decision variables guarantee the production order (or orders portfolio) will completed while following assumed set of performance indexes? In that context a computationally effective approach aimed at simultaneous routing and allocation as well as batching and scheduling of a new portfolio subject to constraints imposed by a multi-project environment is sought. Provided examples illustrate both cases while taking into account robust scheduling requirements imposed by multi-project environment constraints.
引用
收藏
页码:115 / 126
页数:12
相关论文
共 50 条
  • [1] Constraints based scheduling in the multi-project environment
    Skolud, Bozena
    Zientek, Aleksandra
    [J]. Computer Assisted Mechanics and Engineering Sciences, 2005, 12 (2-3): : 247 - 257
  • [2] Multi-project scheduling in a construction environment with resource constraints
    Stephenson, P
    Ying, Y
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2251 - 2255
  • [3] Robust Competence Allocation for Multi-project Scheduling
    Bocewicz, Grzegorz
    Wikarek, Jaroslaw
    Sitek, Pawel
    Banaszak, Zbigniew
    [J]. INFORMATION SYSTEMS ARCHITECTURE AND TECHNOLOGY, ISAT 2019, PT II, 2020, 1051 : 16 - 30
  • [4] Multi-project robust scheduling based on critical chain
    Liu, Qiong
    Lin, Kui
    Zhang, Chao-Yong
    Zhu, Hai-Ping
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (04): : 813 - 820
  • [5] Multi-project scheduling
    Ohmae, Yoshitsugu
    Hasegawa, Susumu
    Okuda, Minoru
    [J]. Journal of information processing, 1992, 15 (02) : 267 - 279
  • [6] Proactive and Reactive Multi-Project Scheduling in Uncertain Environment
    Wang, Weixin
    Ge, Xianlong
    Li, Lvcheng
    Su, Jiafu
    [J]. IEEE ACCESS, 2019, 7 : 88986 - 88997
  • [7] Research on the multi-project task scheduling under multi-resource constraints
    School of Mechanical and Electrical Engineering, Harbin Institute of Technology, Harbin 150001, China
    不详
    [J]. Harbin Gongye Daxue Xuebao, 2007, 7 (1045-1049):
  • [8] Application of Scheduling and Capacity Management Tools in a Multi-project Environment
    Pinto, Leandro
    Pereira, Alberto
    Tereso, Anabela
    Brito, Marlene
    [J]. INFORMATION SYSTEMS AND TECHNOLOGIES, WORLDCIST 2022, VOL 3, 2022, 470 : 157 - 166
  • [9] MULTI-PROJECT SCHEDULING - ANALYSIS OF PROJECT PERFORMANCE
    KURTULUS, IS
    NARULA, SC
    [J]. IIE TRANSACTIONS, 1985, 17 (01) : 58 - 66
  • [10] Multi-project scheduling problem under shared multi-skill resource constraints
    Haroune, Meya
    Dhib, Cheikh
    Neron, Emmanuel
    Soukhal, Ameur
    Babou, Hafed Mohamed
    Nanne, Mohamedade Farouk
    [J]. TOP, 2023, 31 (01) : 194 - 235