Effect of excavation schemes of tbm on risk of rock burst of long tunnels at jinping ii hydropower station

被引:0
|
作者
Wu, Shiyong [1 ]
Zhou, Jifang [1 ]
Chen, Bingrui [2 ]
Huang, Manbin [3 ]
机构
[1] Yalong River Hydropower Development Company Ltd., Chengdu,Sichuan,610051, China
[2] State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan,Hubei,430071, China
[3] Shenyang Railway Survey Design Consulting Company Limited, Shenyang,Liaoning,110013, China
关键词
Compendex;
D O I
10.13722/j.cnki.jrme.2015.04.009
中图分类号
学科分类号
摘要
Rock bursts
引用
收藏
页码:728 / 734
相关论文
共 50 条
  • [1] Rock burst and slabbing failure and its influence on TBM excavation at headrace tunnels in Jinping II hydropower station
    Gong, Q. M.
    Yin, L. J.
    Wu, S. Y.
    Zhao, J.
    Ting, Y.
    [J]. ENGINEERING GEOLOGY, 2012, 124 : 98 - 108
  • [2] Management of rock bursts during excavation of the deep tunnels in Jinping II Hydropower Station
    Zhi-gang Shan
    Peng Yan
    [J]. Bulletin of Engineering Geology and the Environment, 2010, 69 : 353 - 363
  • [3] Management of rock bursts during excavation of the deep tunnels in Jinping II Hydropower Station
    Shan, Zhi-gang
    Yan, Peng
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2010, 69 (03) : 353 - 363
  • [4] Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping II hydropower station
    Wu, Shiyong
    Wang, Ge
    [J]. JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2011, 3 (04) : 314 - 328
  • [6] Microseismic Monitoring of Energy Changes in Deep Tunnels during the TBM Tunneling of the Jinping II Hydropower Station
    Zhuang, Duanyang
    Ma, Ke
    Tang, Chunan
    Liang, Zhengzhao
    Wang, Zhenwei
    [J]. ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [7] Study on acceptable minimum interval of long deeply burial hydropower tunnels in Jinping II hydropower station
    Jiang Quan
    Feng Xia-ting
    Zhou Hui
    [J]. ROCK AND SOIL MECHANICS, 2008, 29 (03) : 656 - 662
  • [8] Rock mass assessment and corresponding TBM operation optimization for TBM tunneling at depth - a case study of Jinping II hydropower station
    Yin, L. J.
    Gong, Q. M.
    Zhao, J.
    [J]. UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1788 - 1795
  • [9] Microseismic sequences associated with rockbursts in the tunnels of the Jinping II hydropower station
    Feng, Guang-Liang
    Feng, Xia-Ting
    Chen, Bing-Rui
    Xiao, Ya-Xun
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2015, 80 : 89 - 100
  • [10] Stability analysis of diversion tunnels in Jinping II hydropower station project
    Zhang, Chuanqing
    Feng, Xiating
    Zhou, Hui
    Huang, Shuling
    Jiang, Quan
    [J]. PHYSICAL AND NUMERICAL SIMULATION OF MATERIALS PROCESSING, PTS 1 AND 2, 2008, 575-578 : 1287 - 1292