Rock mass assessment and corresponding TBM operation optimization for TBM tunneling at depth - a case study of Jinping II hydropower station

被引:0
|
作者
Yin, L. J. [1 ]
Gong, Q. M. [2 ]
Zhao, J. [1 ]
机构
[1] Ecole Polytech Fed Lausanne, Rock Mech Lab, Lausanne, Switzerland
[2] Beijing Univ Technol, Coll Architecture & Civil Engn, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
During TBM tunneling at the great depth, problems such as high in situ stress, groundwater inflow and fractured rock masses are main reasons of the geotechnical risk occurrence in TBM tunneling. Thus it is necessary to modify TBM and optimize TBM operation parameters for improving TBM performance when encountering these adverse geological conditions. In china, two of four headrace tunnels in Jinping II hydropower station project are constructed by two tunnel boring machines. The headrace tunnels are approximately 16.7 km in length and the maximum overburden depth is up to 2,525m. In this paper, the rock masses along the headrace tunnels of Jinping II hydropower station are assessed, and then are classified into three typical excavation sections according to the main controlling factors of TBM excavation. The three typical excavation sections are the normal excavation section, the excavation section controlled by high in situ stress and the excavation section controlled by large groundwater inflow, respectively. In order to overcome the adverse geological conditions in these typical exaction sections, the corresponding modifications and operation optimization for TBM are proposed in this paper. The experiences obtained from Jinping II hydropower station can provide useful reference and guidance for TBM tunneling at depth.
引用
收藏
页码:1788 / 1795
页数:8
相关论文
共 39 条
  • [1] Microseismic Monitoring of Energy Changes in Deep Tunnels during the TBM Tunneling of the Jinping II Hydropower Station
    Zhuang, Duanyang
    Ma, Ke
    Tang, Chunan
    Liang, Zhengzhao
    Wang, Zhenwei
    [J]. ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [2] Effect of excavation schemes of tbm on risk of rock burst of long tunnels at jinping ii hydropower station
    Wu, Shiyong
    Zhou, Jifang
    Chen, Bingrui
    Huang, Manbin
    [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2015, 34 (04): : 728 - 734
  • [3] Acoustic emission monitoring of rockbursts during TBM-excavated headrace tunneling at Jinping II hydropower station
    Cheng, Wuwei
    Wang, Wenyou
    Huang, Shiqiang
    Ma, Peng
    [J]. JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2013, 5 (06) : 486 - 494
  • [4] Rock burst and slabbing failure and its influence on TBM excavation at headrace tunnels in Jinping II hydropower station
    Gong, Q. M.
    Yin, L. J.
    Wu, S. Y.
    Zhao, J.
    Ting, Y.
    [J]. ENGINEERING GEOLOGY, 2012, 124 : 98 - 108
  • [5] Acoustic emission monitoring of rockbursts during TBM-excavated headrace tunneling at Jinping Ⅱ hydropower station
    Wuwei Cheng
    Wenyou Wang
    Shiqiang Huang
    Peng Ma
    [J]. Journal of Rock Mechanics and Geotechnical Engineering, 2013, 5 (06) : 486 - 494
  • [6] Experimental study of slabbing failure for deep-buried marble at Jinping II hydropower station and its influences on TBM excavation
    Wu, Shiyong
    Gong, Qiuming
    Wang, Ge
    Hou, Zhesheng
    She, Qirui
    [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (06): : 1089 - 1095
  • [7] Rock mass damage induced by rockbursts occurring on tunnel floors: a case study of two tunnels at the Jinping II Hydropower Station
    Chuanqing Zhang
    Xia-Ting Feng
    Hui Zhou
    Shili Qiu
    Yanshuang Yang
    [J]. Environmental Earth Sciences, 2014, 71 : 441 - 450
  • [8] Rock mass damage induced by rockbursts occurring on tunnel floors: a case study of two tunnels at the Jinping II Hydropower Station
    Zhang, Chuanqing
    Feng, Xia-Ting
    Zhou, Hui
    Qiu, Shili
    Yang, Yanshuang
    [J]. ENVIRONMENTAL EARTH SCIENCES, 2014, 71 (01) : 441 - 450
  • [9] ONSITE ASSEMBLY AND HARD ROCK TUNNELING AT THE JINPING-II HYDROPOWER STATION POWER TUNNEL PROJECT
    Smading, Stephen M.
    Roby, Joe
    Willis, Desiree
    [J]. 2009 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 2009, : 1308 - 1320
  • [10] Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping II hydropower station
    Wu, Shiyong
    Wang, Ge
    [J]. JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2011, 3 (04) : 314 - 328