共 50 条
- [41] Effect of mining speed on stability control of overburden structure in fully mechanized coal face [J]. Wang, Meng (cumt_wm@126.com), 1600, China University of Mining and Technology (49): : 463 - 470
- [42] Key problems of upward mining under the condition of fully mechanized goaf with large mining height [J]. Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2021, 38 (03): : 449 - 457
- [43] Analysis of the Initial Fracture Characteristics for Main Roof Overlying Fully Mechanized Face with Large Mining Height [J]. Geotechnical and Geological Engineering, 2019, 37 : 3817 - 3829
- [44] Study on distribution law of lead abutment pressure in fully mechanized caving face with large mining height [J]. PROGRESS IN MINE SAFETY SCIENCE AND ENGINEERING II, 2014, : 389 - 394
- [46] Key technology and application of intelligent perception and intelligent control in fully mechanized mining face [J]. Meitan Kexue Jishu/Coal Science and Technology (Peking), 2021, 49 (04): : 28 - 39
- [49] Mechanism and control of strong mine pressure in fully mechanized mining face of shendong mining area when crossing abandoned roadways in the same coal seam [J]. Meitan Xuebao/Journal of the China Coal Society, 2024, 49 (08): : 3335 - 3352