共 50 条
- [3] Influence law of advance speed at fully mechanized longwall face on initial fracture of main roof Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2023, 54 (06): : 2312 - 2322
- [4] Roof structure characteristics in fully mechanized coalface with large mining height and reasonable loading of support Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2014, 31 (04): : 512 - 518
- [7] Reasonable parameters of roof cutting entry retaining in thin immediate roof and large mining height fully-mechanized face Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (07): : 1981 - 1990
- [8] Effect of Face Length in Initial Mining Stage of Fully Mechanized Top-Coal Caving Face with Large Mining Height Geotechnical and Geological Engineering, 2022, 40 : 711 - 722
- [10] The Characteristics of Roof Breaking and the Law of Ground Pressure Behavior in Fully Mechanized Top-coal Caving Face with Large Mining Height Geotechnical and Geological Engineering, 2021, 39 : 285 - 297