Hoisting and Installation Construction Technology for Main Cable Saddle of Nizhou Waterway Bridge of Second Humen Bridge

被引:0
|
作者
虎门二桥坭洲水道桥主索鞍吊装施工技术
机构
[1] Tong, Jun-Hao
[2] Zhu, Chao
[3] Dai, Xi-Hua
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The Nizhou Waterway Bridge of the Second Humen Bridge is an asymmetrical double-tower steel box girder suspension bridge with the main span of 1 688 m. The bridge consists of four main cable saddles, and the main cable saddles have a structure of cast welding that consists of two semi-saddles locked by high-strength bolts. The semi-saddles with the weight of 125 t are installed in the main saddle chamber at the top of a 256.4 m-high tower. The main cable saddles are hoisted by means of transfer platform on the top of bridge pylon cap + support by portal frame on pylon top + vertical hoist by a hydraulic jack with continuous lifting + longitudinal translation by transporter. During the construction, the grid reaction frame is hoisted by a hoisting system on the tower top, and concrete grout is poured into the grid reaction frame after being precisely positioned; then the upper and lower supporting plates are hoisted by the hoisting system on the tower top; finally, two semi-saddles are hoisted to the top of the tower by the hoisting system on the tower top and joined together by the high-strength bolts. During the installation of the superstructure of the main bridge, according to the pre-deflection monitoring instructions, the main saddles are gradually pushed in place by two 1 000 t jacks, thus final positioning and installation of the main saddles are completed. © 2018, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
相关论文
共 50 条
  • [31] Research and application of level rotational construction technology of DWT cable-stayed bridge
    Heilongjiang Institue of Technology, Harbin, 150050, China
    不详
    不详
    Adv. Mater. Res., (2262-2266):
  • [32] Installation Technology of Webs in the Construction of PC Box-girder Bridge with Corrugated Steel Webs
    Du, Yajiang
    Yang, Bingwen
    Wan, Shui
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2209 - +
  • [34] Construction Technology for Steel-Concrete Continuous Composite Girders in 150 m Spans of Main Bridge of Padma Multipurpose Bridge
    Pan, Jun
    Bridge Construction, 2021, 51 (05) : 8 - 13
  • [35] Construction technology on pile foundation of No. 6 main pier in Dashengguan Yangtze Bridge
    Yu, Hongbin
    Lian, Zeping
    FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2009, 3 (03): : 339 - 343
  • [36] Galloping analysis methods for large scale spire type main cable of a suspension bridge during construction
    Li, Shengli
    Wang, Chaoqun
    Ning, Zuoqiang
    Wang, Dongwei
    Zhendong yu Chongji/Journal of Vibration and Shock, 2017, 36 (24): : 51 - 57
  • [37] PC Cable-Stayed Bridge Main Girder Shear Lag Effects: Assessment of Single Cable Plane in Construction Stage
    Li, Yan-feng
    Sun, Xing-long
    Bao, Long-sheng
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2020, 2020
  • [38] Study on the Influence of Working Condition Parameters on the Dynamic Contact and Microslip Behavior between Main Cable Strand and Saddle of Suspension Bridge
    Wang, Dagang
    Xu, Wei
    Li, Chenchen
    Sun, Yuewei
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2024, 60 (19): : 144 - 158
  • [39] Cable Shape and Construction Parameters of Triple-Tower Double-Cable Suspension Bridge with Two Asymmetrical Main Spans
    Zhang, Wen-ming
    Yang, Chao-yu
    Chang, Jia-qi
    JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (02)
  • [40] Construction control of cable-stayed bridge top push method based on BIM technology
    Chengyong Chen
    Wenming Su
    Wenqiang Dou
    Yongquan Dong
    Ben Zhang
    Discover Applied Sciences, 7 (4)