Hoisting and Installation Construction Technology for Main Cable Saddle of Nizhou Waterway Bridge of Second Humen Bridge

被引:0
|
作者
虎门二桥坭洲水道桥主索鞍吊装施工技术
机构
[1] Tong, Jun-Hao
[2] Zhu, Chao
[3] Dai, Xi-Hua
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The Nizhou Waterway Bridge of the Second Humen Bridge is an asymmetrical double-tower steel box girder suspension bridge with the main span of 1 688 m. The bridge consists of four main cable saddles, and the main cable saddles have a structure of cast welding that consists of two semi-saddles locked by high-strength bolts. The semi-saddles with the weight of 125 t are installed in the main saddle chamber at the top of a 256.4 m-high tower. The main cable saddles are hoisted by means of transfer platform on the top of bridge pylon cap + support by portal frame on pylon top + vertical hoist by a hydraulic jack with continuous lifting + longitudinal translation by transporter. During the construction, the grid reaction frame is hoisted by a hoisting system on the tower top, and concrete grout is poured into the grid reaction frame after being precisely positioned; then the upper and lower supporting plates are hoisted by the hoisting system on the tower top; finally, two semi-saddles are hoisted to the top of the tower by the hoisting system on the tower top and joined together by the high-strength bolts. During the installation of the superstructure of the main bridge, according to the pre-deflection monitoring instructions, the main saddles are gradually pushed in place by two 1 000 t jacks, thus final positioning and installation of the main saddles are completed. © 2018, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
相关论文
共 50 条
  • [21] Construction management and technology innovation for main projects of Quanzhou Bay Bridge
    Du, Jun
    Weng, Fangwen
    FRONTIERS OF ENGINEERING MANAGEMENT, 2021, 8 (01) : 151 - 155
  • [22] Construction management and technology innovation for main projects of Quanzhou Bay Bridge
    Jun Du
    Fangwen Weng
    Frontiers of Engineering Management, 2021, 8 : 151 - 155
  • [23] Experimental Study of Aerodynamic Disturbance Effect of Existing Bridge on Main Girder of Under-Construction Cable-Stayed Bridge
    Wang C.-C.
    Ding D.-H.
    Zhu Y.
    Bridge Construction, 2023, 53 : 25 - 30
  • [24] CORRECTION TECHNOLOGY FOR MAIN GIRDER TORSION IN A COMPOSITE GIRDER CABLE-STAYED BRIDGE
    She, Q. C.
    Yan, D. H.
    Chen, C. S.
    Li, B.
    Huang, G.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2023, 22 (03) : 450 - 461
  • [25] Asymmetric Construction Technology of Partially Cable-stayed Bridge with Single Tower and Single Cable Plane
    Sun, Xiaomeng
    Yan, Zicai
    Zhu, Dayong
    Chen, Hui
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 881 - +
  • [26] Nonlinear analysis of cable-hoisting construction of long-span concrete filled steel tube arch bridge
    Key Laboratory for Bridge and Tunnel of Shanxi Province, Chang'an University, Xi'an 710064, China
    不详
    Wuhan Ligong Daxue Xuebao, 2007, 2 (114-117):
  • [27] Research on Calculation Method of Main Cable System Construction Control of Long Span Suspension Bridge
    梅葵花
    孙胜江
    何湘峰
    公路, 2010, (10) : 1 - 5
  • [28] Application of the Kalman's filtering method to the suspension bridge construction control - the main cable erecting
    Hua, Yingchun
    Zhang, Jinquan
    Gongku Jiaotong Keji/Journal of Highway and Transportation Research and Development, 16 (02): : 35 - 38
  • [29] Calculation method of main cable system construction control of long-span suspension bridge
    Huang, Pingming
    Mei, Kuihua
    Xu, Yue
    Xi'an Gonglu Xueyuan Xuebao/Journal of Xi'an Highway Transportation University, 2000, 20 (04): : 19 - 22
  • [30] Research and Application of Level Rotational Construction Technology of DWT Cable-Stayed Bridge
    Wang, Shijie
    Zhu, Xun
    Gao, Zhendong
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2262 - 2266