FUZZY-TOPSIS method for defining optimal parameters and finding suitable sites for PV power plants

被引:11
|
作者
Saeidi R. [1 ]
Noorollahi Y. [1 ]
Aghaz J. [1 ]
Chang S. [2 ]
机构
[1] Energy Modelling and Sustainable Energy System (METSAP) Research Lab., Faculty of New Sciences and Technologies, University of Tehran
[2] Construction Management Technology, Purdue Polytechnic Institute, Purdue University
关键词
Fuzzy TOPSIS; GIS; MCDM; Site selection; Solar power plants;
D O I
10.1016/j.energy.2023.128556
中图分类号
学科分类号
摘要
This study aims to assess and locate the potential for solar power plants (SPP) by utilizing TOPSIS decision analysis and based Fuzzy-Boolean logic based on GIS in Tehran province, Iran. GIS was used as a robust tool for data processing to gather practical and necessary information for effective resources and facilities. Through the multicriteria decision-making method (MCDM), alternative sites were identified and prioritized. The fuzzy logic method was employed to evaluate regions and generate thematic maps, revealing that approximately 95% (14,350 km2) of the region's area was unsuitable for constructing a power plant, while 5% (741 km2) was suitable. From the suitable areas, nine locations were selected for photovoltaic plant construction, totaling 22 km2, occupying 0.15% of the province's total area. Fuzzy TOPSIS was then used to prioritize the alternatives, resulting in the selection of Ghiyeh Naserieh in the southern part of the province as the preferred location for the power generation unit. © 2023 Elsevier Ltd
引用
收藏
相关论文
共 9 条
  • [1] Power Plant Project Risk Assessment Using a Fuzzy-ANP and Fuzzy-TOPSIS Method
    Zegordi, S. H.
    Nik, E. Rezaee
    Nazari, A.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2012, 25 (02): : 107 - 120
  • [2] An evaluation of power plants in Turkey: Fuzzy TOPSIS method
    Boran, Kurtulus
    ENERGY SOURCES PART B-ECONOMICS PLANNING AND POLICY, 2017, 12 (02) : 119 - 125
  • [3] Finding the optimal combination of power plants alternatives: A multi response Taguchi-neural network using TOPSIS and fuzzy best-worst method
    Omrani, Hashem
    Alizadeh, Arash
    Emrouznejad, Ali
    JOURNAL OF CLEANER PRODUCTION, 2018, 203 : 210 - 223
  • [4] Evaluation of optimal route selection for public transport network routes on urban roads using Fuzzy-TOPSIS method
    Madhu, K. A.
    Rajakumara, H. N.
    Kangda, Mohd Zain
    Girija, S. P.
    Reddy, Ganta Raghotham
    Wodajo, Anteneh Wogasso
    ENGINEERING REPORTS, 2024, 6 (06)
  • [5] Power Plants Location Selection Based on Entropy Method and Fuzzy TOPSIS
    Chen Wenhu
    Zhang Nan
    PROCEEDINGS FOR THE 5TH EURO-ASIA CONFERENCE ON ENVIRONMENT AND CORPORATE SOCIAL RESPONSIBILITY: MANAGEMENT SCIENCE AND ENGINEERING, PT I, 2009, : 11 - 16
  • [6] Finding an optimal PV panel maximum power point tracking method
    Bekker, B
    Beukes, HJ
    2004 IEEE AFRICON: 7TH AFRICON CONFERENCE IN AFRICA, VOLS 1 AND 2: TECHNOLOGY INNOVATION, 2004, : 1125 - 1129
  • [7] A GIS-based multi-criteria decision making method for the potential assessment and suitable sites selection of PV and CSP plants
    Sun, Lijian
    Jiang, Yuncheng
    Guo, Qingsheng
    Ji, Ling
    Xie, Yulei
    Qiao, Qinhua
    Huang, Guohe
    Xiao, Kun
    RESOURCES CONSERVATION AND RECYCLING, 2021, 168
  • [8] Determination of the suitable sites for constructing solar photovoltaic (PV) power plants in Kayseri, Turkey using GIS-based ranking and AHP methods
    Gunen, Mehmet Akif
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (40) : 57232 - 57247
  • [9] Determination of the suitable sites for constructing solar photovoltaic (PV) power plants in Kayseri, Turkey using GIS-based ranking and AHP methods
    Mehmet Akif Günen
    Environmental Science and Pollution Research, 2021, 28 : 57232 - 57247