An evaluation of power plants in Turkey: Fuzzy TOPSIS method

被引:25
|
作者
Boran, Kurtulus [1 ]
机构
[1] Gazi Univ, Dept Energy Syst Engn, Fac Technol, Tekn Kullar, TR-06500 Ankara, Turkey
关键词
Fuzzy set; multi-criteria decision making; power plants; the TOPSIS method; ELECTRICITY-GENERATION; MULTIDIMENSIONAL-ANALYSIS; LOCATION; CONSUMPTION; SELECTION;
D O I
10.1080/15567249.2015.1050561
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The demand of electricity in Turkey grew in the last few years and it is seen that it will be expected to continue in the next few years. The fossil fuels, especially lignite and hard coal, and hydro are the main kinds of energy sources for electricity generation in Turkey. Therefore, hard coal and lignite have been commonly utilized as fuels in power plants. Despite electricity generation in these power plants with low cost being efficient, the main drawback is the emission of greenhouse gases. In this study, an evaluation of power plants in Turkey is performed using the fuzzy technique for order preference by similarity to ideal solution (TOPSIS) method due to containing incomplete information in the evaluation process. The criteria, installation cost, efficiency, emission of carbon dioxide gas, electricity cost, and social acceptance have been considered in the fuzzy TOPSIS method.
引用
收藏
页码:119 / 125
页数:7
相关论文
共 50 条
  • [1] Using Intuitionistic Fuzzy TOPSIS in Site Selection of Wind Power Plants in Turkey
    Rouyendegh , Babak Daneshvar
    Yildizbasi, Abdullah
    Arikan, Ummuhan Z. B.
    ADVANCES IN FUZZY SYSTEMS, 2018, 2018
  • [2] Power Plants Location Selection Based on Entropy Method and Fuzzy TOPSIS
    Chen Wenhu
    Zhang Nan
    PROCEEDINGS FOR THE 5TH EURO-ASIA CONFERENCE ON ENVIRONMENT AND CORPORATE SOCIAL RESPONSIBILITY: MANAGEMENT SCIENCE AND ENGINEERING, PT I, 2009, : 11 - 16
  • [3] Wind turbine evaluation using the hesitant fuzzy AHP-TOPSIS method with a case in Turkey
    Beskese, Ahmet
    Camci, Alper
    Temur, Gul Tekin
    Erturk, Ercan
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 38 (01) : 997 - 1011
  • [4] The evaluation of renewable energy alternatives for sustainable development in Turkey using intuitionistic fuzzy-TOPSIS method
    Bilgili, Faik
    Zarali, Fulya
    Ilgun, Mirac Fatih
    Dumrul, Cuneyt
    Dumrul, Yasemin
    RENEWABLE ENERGY, 2022, 189 : 1443 - 1458
  • [5] Fuzzy TOPSIS method for ranking renewable energy supply systems in Turkey
    Sengul, Umran
    Eren, Mirac
    Shiraz, Seyedhadi Eslamian
    Gezder, Volkan
    Sengul, Ahmet Bilal
    RENEWABLE ENERGY, 2015, 75 : 617 - 625
  • [6] FUZZY-TOPSIS method for defining optimal parameters and finding suitable sites for PV power plants
    Saeidi R.
    Noorollahi Y.
    Aghaz J.
    Chang S.
    Energy, 2023, 282
  • [7] Evaluation of power plants to prioritise the investment projects using fuzzy PROMETHEE method
    Tabaraee, Elham
    Ebrahimnejad, Sadoullah
    Bamdad, Shahrooz
    INTERNATIONAL JOURNAL OF SUSTAINABLE ENERGY, 2018, 37 (10) : 941 - 955
  • [8] Evaluation of Technical Innovation Ability Based on Fuzzy TOPSIS Method
    Yu, Shunkun
    Shi, Yufeng
    KAM: 2008 INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING, PROCEEDINGS, 2008, : 380 - 383
  • [9] The Evaluation of Renewable Energy Technologies for Electricity Generation in Turkey Using Intuitionistic Fuzzy TOPSIS
    Boran, F. E.
    Boran, K.
    Menlik, T.
    ENERGY SOURCES PART B-ECONOMICS PLANNING AND POLICY, 2012, 7 (01) : 81 - 90
  • [10] Power plant Location Selection based on Entropy Method and Fuzzy TOPSIS
    Huang, Meng
    Meng, Xianming
    Cui, Weiqun
    Wang, Jinping
    Yao, Xiufeng
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT ENGINEERING AND INFORMATION TECHNOLOGY, VOLS 1 AND 2, 2009, : 711 - 713