Finding the optimal combination of power plants alternatives: A multi response Taguchi-neural network using TOPSIS and fuzzy best-worst method

被引:80
|
作者
Omrani, Hashem [1 ]
Alizadeh, Arash [1 ]
Emrouznejad, Ali [2 ]
机构
[1] Urmia Univ Technol, Fac Ind Engn, Orumiyeh, Iran
[2] Aston Univ, Aston Business Sch, Birmingham, W Midlands, England
关键词
Power plants; Eco-efficiency; Taguchi method; Neural network; Fuzzy best worst method; TOPSIS; MULTICRITERIA DECISION-MAKING; RENEWABLE ENERGY-SOURCES; ECO-EFFICIENCY; TECHNOLOGIES; PRIORITIZATION; OPTIMIZATION; SELECTION; AHP; SUSTAINABILITY; SYSTEMS;
D O I
10.1016/j.jclepro.2018.08.238
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With increasing growth of electricity consumption in developed and developing countries, the necessity of constructing and developing of power plants is inevitable. There are two main resources for electricity generation includes fossil and renewable energies which have some different characteristics such as manufacturing technology, environmental issues, accessibility and etc. In developing plans, it is important to consider and address the policy makers' indicators such as environmental, social, economic and technical criteria. In this paper, an integrated multi response Taguchi-neural network-fuzzy best-worst method (FBWM) -TOPSIS approach is applied to find an optimal level of five different power plants including: gas, steam, combined cycle, wind and hydroelectric. Taguchi method is used to design combinations and calculate some of the signal to noise (S/N) ratios. Then, neural network is applied to estimate the rest of S/N ratios. Finally, FBWM and TOPSIS methods are used for weighing sub-indicators and selecting the best combination, respectively. To illustrate the usefulness of the proposed approach, a case study on the development of power plants in Iran is considered and the results are discussed. According to the results, in general, small size power plants for fossil resources are preferable. In contrast, medium and larger size power plants for renewable resources are preferable. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:210 / 223
页数:14
相关论文
共 5 条
  • [1] Green Supplier Selection Using Improved TOPSIS and Best-Worst Method Under Intuitionistic Fuzzy Environment
    Tian, Zhang-Peng
    Zhang, Hong-Yu
    Wang, Jian-Qiang
    Wang, Tie-Li
    INFORMATICA, 2018, 29 (04) : 773 - 800
  • [2] FUZZY-TOPSIS method for defining optimal parameters and finding suitable sites for PV power plants
    Saeidi R.
    Noorollahi Y.
    Aghaz J.
    Chang S.
    Energy, 2023, 282
  • [3] Multi-criteria sustainable supplier selection using piecewise linear value function and fuzzy best-worst method
    Ghoushchi, Saeid Jafarzadeh
    Khazaeili, Mohammad
    Amini, Amir
    Osgooei, Elnaz
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2019, 37 (02) : 2309 - 2325
  • [4] Towards the adoption of most suitable green walls within sustainable buildings using interval type-2 fuzzy best-worst method and TOPSIS technique
    Tabatabaee, Sanaz
    Ashour, Mojtaba
    Sadeghi, Haleh
    Hoseini, Seyed Amirali
    Mohandes, Saeed Reza
    Mahdiyar, Amir
    Ismail, Syuhaida
    Hosseini, M. Reza
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (03) : 1145 - 1164
  • [5] Identifying Optimal Sites for a Rainwater-Harvesting Agricultural Scheme in Iran Using the Best-Worst Method and Fuzzy Logic in a GIS-Based Decision Support System
    Aghaloo, Kamaleddin
    Chiu, Yie-Ru
    WATER, 2020, 12 (07)