A heuristic for single model U-line assembly line balancing with stochastic task time

被引:0
|
作者
Agpak, Kürs¸ad [1 ]
Gökçen, Hadi [2 ]
Saray, N. Nergiz [2 ]
Özel, Suna [2 ]
机构
[1] Endustri Muh. Bolumu, Gaziantep Üniversitesi, Gaziantep
[2] Endustri Muh. Bolumu, Müh. Mim. Fak., Gazi Üniversitesi, Ankara
关键词
Optimization - Probability - Problem solving - Stochastic control systems;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, a new heuristic procedure for single model U-line balancing problem with stochastic task time is proposed. The proposed procedure is based on the COMSOAL method developed by Arcus for traditional deterministic single model assembly lines. The aim of the procedure is to assign tasks to stations such that number of station will be minimized and probability confidence levels set by management will not exceeded for each station time.
引用
收藏
页码:115 / 124
相关论文
共 50 条
  • [41] A new heuristic method for mixed model assembly line balancing problem
    Jin, MZ
    Wu, SD
    COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 44 (01) : 159 - 169
  • [42] Heuristic Method for Line Balancing and Simulation of Power Converter Assembly Line
    Kharuddin, Mohammad Huskhazrin
    Ramli, Mohammad Fadzli
    Zakaria, Mohd Zakimi
    2018 IEEE 5TH INTERNATIONAL CONFERENCE ON SMART INSTRUMENTATION, MEASUREMENT AND APPLICATION (ICSIMA), 2018,
  • [43] COMPLEXITY OF SINGLE MODEL ASSEMBLY LINE BALANCING PROBLEMS
    BHATTACHARJEE, TK
    SAHU, S
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1990, 18 (03): : 203 - 214
  • [44] An efficient algorithm for U-type assembly line re-balancing problem with stochastic task times
    Serin, Faruk
    Mete, Suleyman
    Celik, Erkan
    ASSEMBLY AUTOMATION, 2019, 39 (04) : 581 - 595
  • [45] A modified colonial competitive algorithm for the mixed-model U-line balancing and sequencing problem
    Lian, Kunlei
    Zhang, Chaoyong
    Gao, Liang
    Shao, Xinyu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) : 5117 - 5131
  • [46] Type-1 U-shaped Assembly Line Balancing under uncertain task time
    Li, Yuchen
    Hu, Xiaofeng
    Tang, Xiaowen
    Kucukkoc, Ibrahim
    IFAC PAPERSONLINE, 2019, 52 (13): : 992 - 997
  • [48] IDENTIFYING MULTIPLE SOLUTIONS FOR ASSEMBLY LINE BALANCING HAVING STOCHASTIC TASK TIMES
    BETTS, J
    MAHMOUD, KI
    COMPUTERS & INDUSTRIAL ENGINEERING, 1989, 16 (03) : 427 - 445
  • [49] A heuristic approach for U-shaped assembly line balancing to improve labor productivity
    Avikal, Shwetank
    Jain, Rajeev
    Mishra, P. K.
    Yadav, H. C.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (04) : 895 - 901
  • [50] Enhanced beam search heuristic for U-shaped assembly line balancing problems
    Li, Zixiang
    Janardhanan, Mukund Nilakantan
    Rahman, Humyun Fuad
    ENGINEERING OPTIMIZATION, 2021, 53 (04) : 594 - 608