A heuristic for single model U-line assembly line balancing with stochastic task time

被引:0
|
作者
Agpak, Kürs¸ad [1 ]
Gökçen, Hadi [2 ]
Saray, N. Nergiz [2 ]
Özel, Suna [2 ]
机构
[1] Endustri Muh. Bolumu, Gaziantep Üniversitesi, Gaziantep
[2] Endustri Muh. Bolumu, Müh. Mim. Fak., Gazi Üniversitesi, Ankara
关键词
Optimization - Probability - Problem solving - Stochastic control systems;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, a new heuristic procedure for single model U-line balancing problem with stochastic task time is proposed. The proposed procedure is based on the COMSOAL method developed by Arcus for traditional deterministic single model assembly lines. The aim of the procedure is to assign tasks to stations such that number of station will be minimized and probability confidence levels set by management will not exceeded for each station time.
引用
收藏
页码:115 / 124
相关论文
共 50 条
  • [31] A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives
    Toklu, Bilal
    Oezcan, Ugor
    ENGINEERING OPTIMIZATION, 2008, 40 (03) : 191 - 204
  • [32] Mixed model U-line balancing type-1 problem: A new approach
    Rabbani, Masoud
    Kazemi, Seyed Mahmood
    Manavizadeh, Neda
    JOURNAL OF MANUFACTURING SYSTEMS, 2012, 31 (02) : 131 - 138
  • [33] HEURISTIC METHOD FOR MANUFACTURING ASSEMBLY LINE BALANCING
    PANG, CC
    WESTERN ELECTRIC ENGINEER, 1975, 19 (04): : 36 - 45
  • [34] Simple assembly line balancing - heuristic approaches
    Scholl Armin
    Voss Stefan
    Journal of Heuristics, 1997, 2 (3) : 217 - 244
  • [35] A NEW HEURISTIC APPROACH TO ASSEMBLY LINE BALANCING
    RAOUF, A
    TSUI, CL
    ELSAYED, EA
    COMPUTERS & INDUSTRIAL ENGINEERING, 1980, 4 (03) : 223 - 234
  • [36] A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
    McMullen, PR
    Frazier, GV
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 51 (03) : 177 - 190
  • [37] Simple assembly line balancing - heuristic approaches
    Scholl, Armin
    Voss, Stefan
    Journal of Heuristics, 2 (03): : 217 - 244
  • [38] Robotic stochastic assembly line balancing
    Sahin, Muhammet Ceyhan
    Tural, Mustafa Kemal
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2023, 35 (04) : 1076 - 1115
  • [39] Robotic stochastic assembly line balancing
    Muhammet Ceyhan Şahin
    Mustafa Kemal Tural
    Flexible Services and Manufacturing Journal, 2023, 35 : 1076 - 1115
  • [40] A new heuristic approach for line balancing and model sequencing problems of mixed model U shaped assembly lines
    Özcan, Uǧur
    Peker, Ahmet
    Journal of the Faculty of Engineering and Architecture of Gazi University, 2007, 22 (02): : 277 - 286